Difference between revisions of "NEG coated 2.5 inch OD BPM's"
Jump to navigation
Jump to search
Line 4: | Line 4: | ||
*weldment [[media:JL0091130-0114 BPM TUBE WELDMENT, REV-.pdf]] | *weldment [[media:JL0091130-0114 BPM TUBE WELDMENT, REV-.pdf]] | ||
− | + | == Assembly Sequence == | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | == Assembly == | ||
− | |||
# Receive can/feedthroughs | # Receive can/feedthroughs | ||
# Clean | # Clean | ||
Line 24: | Line 15: | ||
# electrical measurement | # electrical measurement | ||
# report K's and center | # report K's and center | ||
+ | |||
+ | == Gabou Measurements == | ||
+ | |||
+ | * Summary - [[media:UITF_SPM_Summary_9_21.ods]] | ||
+ | |||
+ | * NEG BPM #1 | ||
+ | ::- [[media:NEG_1_1cmx2cm_lower.pdf]] | ||
+ | * NEG BPM #2 | ||
+ | ::- [[media:NEG_2_1cmx2cm_upper.pdf]] | ||
+ | ::- [[media:NEG_2_1cmx2cm_boresight.pdf]] | ||
+ | * NEG BPM #3 | ||
+ | * NEG BPM #4 |
Revision as of 16:11, 14 June 2021
New BPM's were developed for the 200 kV gun NEG tube beam line.
ME Design
Assembly Sequence
- Receive can/feedthroughs
- Clean
- Degas
- NEG Coat
- Check feedthroughs
- Assemble feedthroughs
- serialize
- Leak check cans
- electrical measurement
- report K's and center
Gabou Measurements
- Summary - media:UITF_SPM_Summary_9_21.ods
- NEG BPM #1
- NEG BPM #2
- NEG BPM #3
- NEG BPM #4