Line 17: | Line 17: | ||
# Report K's and center | # Report K's and center | ||
− | == Electrical Measurements == | + | == Electrical Measurements (K's, center, and linearity plots) == |
* Summary (see NEG BPM 1-4) - [[media:UITF_SPM_Summary_9_21.ods]] | * Summary (see NEG BPM 1-4) - [[media:UITF_SPM_Summary_9_21.ods]] |
Revision as of 16:19, 14 June 2021
200 KV BPM's with NEG coating
ME Design
- can weldment media:JL0091130-0114 BPM TUBE WELDMENT, REV-.pdf
- final assembly drawing coming from danny
Assembly Sequence
- Receive can/feedthroughs
- Clean
- Degas
- NEG Coat
- Check feedthroughs
- Assemble feedthroughs
- Serialize
- Leak check cans
- Electrical measurement
- Report K's and center
Electrical Measurements (K's, center, and linearity plots)
- Summary (see NEG BPM 1-4) - media:UITF_SPM_Summary_9_21.ods
- NEG BPM #1 - media:NEG_1_1cmx2cm_lower.pdf
- NEG BPM #2 - media:NEG_2_1cmx2cm_upper.pdf, media:NEG_2_1cmx2cm_boresight.pdf
- NEG BPM #3