Revision as of 16:19, 14 June 2021

200 KV BPM's with NEG coating

ME Design

Assembly Sequence

  1. Receive can/feedthroughs
  2. Clean
  3. Degas
  4. NEG Coat
  5. Check feedthroughs
  6. Assemble feedthroughs
  7. Serialize
  8. Leak check cans
  9. Electrical measurement
  10. Report K's and center

Electrical Measurements (K's, center, and linearity plots)