Difference between revisions of "2021-08-04"
Jump to navigation
Jump to search
Line 20: | Line 20: | ||
Reports by Group: | Reports by Group: | ||
+ | Experiment: | ||
+ | * Past Experiment (HDIce) off floor largely; dilution refrigerator / pump cart craned out & high bay control room reconfigured for High-B. | ||
+ | |||
+ | |||
CIS/EGG: | CIS/EGG: | ||
* [https://logbooks.jlab.org/entry/3890263 Gun operating] at 180kV w/o Field Emission following rebuild, HV conditioning, and Kr processing (Many thanks to all involved!!) | * [https://logbooks.jlab.org/entry/3890263 Gun operating] at 180kV w/o Field Emission following rebuild, HV conditioning, and Kr processing (Many thanks to all involved!!) | ||
+ | * Many improvements and modifications made to prep chamber. New pucks prepared as well. | ||
* HV tests with a [https://logbooks.jlab.org/entry/3890265 GaAs puck (#8)] in the gun (8/3) [Carlos] | * HV tests with a [https://logbooks.jlab.org/entry/3890265 GaAs puck (#8)] in the gun (8/3) [Carlos] | ||
* Gun HVPS [https://logbooks.jlab.org/entry/3890297 locked out] , reconnect gun valve, charge NF3, degas heater/puck, get UITF laser on (8/4) | * Gun HVPS [https://logbooks.jlab.org/entry/3890297 locked out] , reconnect gun valve, charge NF3, degas heater/puck, get UITF laser on (8/4) | ||
Line 27: | Line 32: | ||
* Align laser to photocathode, using retro and QE (8/5) [Shukui] | * Align laser to photocathode, using retro and QE (8/5) [Shukui] | ||
* [https://wiki.jlab.org/ciswiki/index.php/Spring_2021_-_Rebuilding_Photogun Gun rebuild wiki] | * [https://wiki.jlab.org/ciswiki/index.php/Spring_2021_-_Rebuilding_Photogun Gun rebuild wiki] | ||
+ | * Racks and [https://logbooks.jlab.org/entry/3879710 Mott crate] staged for later experiments | ||
Line 40: | Line 46: | ||
Instrumentation and Controls: | Instrumentation and Controls: | ||
+ | |||
''Viewer system status [IC; Norris / McCaughan]'' | ''Viewer system status [IC; Norris / McCaughan]'' | ||
Line 46: | Line 53: | ||
*# Drag cable and connect IYGM603 and IYGM603 (appropriated from HDice line, swapped ITV > YAG). | *# Drag cable and connect IYGM603 and IYGM603 (appropriated from HDice line, swapped ITV > YAG). | ||
*# Brian Freeman available for adViewer work for video camera for ITVM604A? Dome focusing still required... | *# Brian Freeman available for adViewer work for video camera for ITVM604A? Dome focusing still required... | ||
+ | |||
''Wire Scanners [Delacruz / Poelker]'' | ''Wire Scanners [Delacruz / Poelker]'' | ||
* IHAM703 Status (Scanner swapped out) | * IHAM703 Status (Scanner swapped out) | ||
+ | |||
''Chopper Controls (Windham/Lu)'' | ''Chopper Controls (Windham/Lu)'' | ||
Line 54: | Line 63: | ||
* Encoder mapping (/10) | * Encoder mapping (/10) | ||
* Controls transparent to user | * Controls transparent to user | ||
+ | |||
''Chopper Controls (Windham/Lu)'' | ''Chopper Controls (Windham/Lu)'' | ||
* Target Motion Control - [https://logbooks.jlab.org/entry/3884440 Carriage remotely operable], step count needs some fine tuning. | * Target Motion Control - [https://logbooks.jlab.org/entry/3884440 Carriage remotely operable], step count needs some fine tuning. | ||
* Control Screen complete? | * Control Screen complete? | ||
+ | |||
''BPMs (Windham / Hesse / McCaughan)'' | ''BPMs (Windham / Hesse / McCaughan)'' | ||
Line 65: | Line 76: | ||
* Re-label locally. | * Re-label locally. | ||
− | ''Faraday Cups (Francis)'' | + | |
+ | ''Faraday Cups / Picoammeters (Francis)'' | ||
* FC cups 3 & 4 installed in new locations and under vacuum | * FC cups 3 & 4 installed in new locations and under vacuum | ||
* Cables / air lines /etc pulled to new locations and installed | * Cables / air lines /etc pulled to new locations and installed | ||
* Connections removed for shielding installation per RCG. | * Connections removed for shielding installation per RCG. | ||
+ | * Picoammeters all good - some screen work required. | ||
+ | |||
+ | |||
+ | Vacuum | ||
+ | * VBVM501 & VBVM602 slow valve connections. VBVM602 is new installation. | ||
+ | * VFVM401 Fast Valve installation | ||
+ | * VCGM604 Cathode Gauge installed | ||
+ | * VGPM401, 603, 604, and 703 NEG pumps - installation completed, activated, status of remote powering? | ||
+ | * Numerous VIPs installed, functional, on EPICS, and archived. | ||
+ | * Thin Ti window installed by experiment, pumped down, leak checked , and signage / PPE posted. | ||
+ | |||
Revision as of 19:49, 3 August 2021
Meeting Information
Connecting
To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/984025598.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 984025598.
- To join via phone, use one of the following numbers and the Conference ID: 984025598.
- Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada
Agenda
Schedule
Long Term Schedule: Gantt (Outstanding tasks)
- 8/9/21 Start Hot Check-out
New items for discussion:
Short term schedule update:
This week:
Reports by Group: Experiment:
- Past Experiment (HDIce) off floor largely; dilution refrigerator / pump cart craned out & high bay control room reconfigured for High-B.
CIS/EGG:
- Gun operating at 180kV w/o Field Emission following rebuild, HV conditioning, and Kr processing (Many thanks to all involved!!)
- Many improvements and modifications made to prep chamber. New pucks prepared as well.
- HV tests with a GaAs puck (#8) in the gun (8/3) [Carlos]
- Gun HVPS locked out , reconnect gun valve, charge NF3, degas heater/puck, get UITF laser on (8/4)
- Make photocathode (8/5) [Joe/Max]
- Align laser to photocathode, using retro and QE (8/5) [Shukui]
- Gun rebuild wiki
- Racks and Mott crate staged for later experiments
DC Power:
- Trims:
- Trim magnets near gun re-cabled.
- Wastewater beam line trims cabled up.
- Trim magnets near FC#3: 401H/V (completed) & 501H/V correctors + 501 quad
- Solenoid PS being installed. Supply placed, cables pulled, cabled, and LCW hooked up.
- MHB magnet re-designation to MLH to avoid confusion: Chris Gould making nomenclature changes / Gary Croke & Michele Joyce making controls changes / Eric Forman to update Quick Reference Drawing / Shaun to take care of song sheets
- Changes made in UED workspace for names and field maps; ready to merge soon. (Thanks Gary/Michele!)
Instrumentation and Controls:
Viewer system status [IC; Norris / McCaughan]
- Recable 2 viewers in keV whose channels & hardware were appropriated for HDice (done)
- Reconnect IYGM401 (formerly ITV, now YAG)
- Drag cable and connect IYGM603 and IYGM603 (appropriated from HDice line, swapped ITV > YAG).
- Brian Freeman available for adViewer work for video camera for ITVM604A? Dome focusing still required...
Wire Scanners [Delacruz / Poelker]
- IHAM703 Status (Scanner swapped out)
Chopper Controls (Windham/Lu)
- STAC5 Controls replacement (done)
- Encoder mapping (/10)
- Controls transparent to user
Chopper Controls (Windham/Lu)
- Target Motion Control - Carriage remotely operable, step count needs some fine tuning.
- Control Screen complete?
BPMs (Windham / Hesse / McCaughan)
- Install new BPMs on line (completed)
- Map DR receivers to appropriate chassis (completed)
- Correct all naming and controls issues
- Re-label locally.
Faraday Cups / Picoammeters (Francis)
- FC cups 3 & 4 installed in new locations and under vacuum
- Cables / air lines /etc pulled to new locations and installed
- Connections removed for shielding installation per RCG.
- Picoammeters all good - some screen work required.
Vacuum
- VBVM501 & VBVM602 slow valve connections. VBVM602 is new installation.
- VFVM401 Fast Valve installation
- VCGM604 Cathode Gauge installed
- VGPM401, 603, 604, and 703 NEG pumps - installation completed, activated, status of remote powering?
- Numerous VIPs installed, functional, on EPICS, and archived.
- Thin Ti window installed by experiment, pumped down, leak checked , and signage / PPE posted.
BCM
- BCM project software integration under way between Musson/Seaton and Sue Witherspoon
RF:
- 6GHz > 1.5GHz Down-converter installed for bunch length system
Vacuum:
SSG:
- BLM locations being set 7/21 following this meeting
- FSD inputs for magnet and BCM being prepared
ME / Installation:
- Pb stacked; RCG required modification due to permanent shielding req delay.
- New designs for FC3 and FC4 with a great many thanks to Shaun for the design work and John/Xi for Pb arrangement and table construction!
- Songsheet being updated by Shaun; be sure to let him know when changes are made!
- Status of permanent shielding purchase?
Experiment:
- COO/ESAD/RSAD prepared; committee response in progress.
Other:
- EES work happening in earnest
- List of Engineering Jobs remaining
Still to do:
- Add Mu metal over bellows on wastewater line.
Next Week:
- Mount bottle rack in Labyrinth (Staged); remove gas bottles to rack.
- Unistrut mounting for cables - Neal will do when available
- Engineering work on beam line starting
2 weeks:
- Pull Heliax from Spectrum analyzer/Control room >> Buncher
- 4th terminal system in Control room under assembly/rebuild
- Items from To-do list...
Engineering Other business
Reports on Open Action Items:
Action Items:
- Formal run plan (McCaughan) Strawman