;DAQ
 
;DAQ
 
* PMT-5R ItoV amplifier with remote control - 6/23 CC order placed to Advanced Instruments Corp, delivery date TBD
 
* PMT-5R ItoV amplifier with remote control - 6/23 CC order placed to Advanced Instruments Corp, delivery date TBD
 +
* Rack- Last week? we discussed a rack layout showing all components + add/list odds/ends still needed UITF cables, connectors, patch panel, lifting bolts?, wheels?, can we finalize/order these
 +
* Rest of DAQ (hardware and software) - how are we looking for UITF readiness ... Like = Aug 1, Should = Sep 1, Must = Oct 1
  
 
;What else?
 
;What else?
 
* NIM paper - Riad's good idea - some of us will draft an outline in overleaf, later we'll look for short technical descriptions/results,
 
* NIM paper - Riad's good idea - some of us will draft an outline in overleaf, later we'll look for short technical descriptions/results,
 
* Manual - More of an operational document to augment NIM paper technical description
 
* Manual - More of an operational document to augment NIM paper technical description

Revision as of 12:44, 29 June 2022

6/29/22 Updates...

ME
  • Stands - Last week we said 'pull the trigger' on UITF stand (has been purchased?), later will order stand for BNL => Where is PR?
  • Collimator - Last week Riad provided drawing, found material but does not know if OHFC. Need (2) per this drawing. media:JL0015777_Cu_collimator.pdf What about ID hole???
  • Absorbers - Christine provided drawing 6/3, I forgot to act on this! Need (6) per this drawing => media:Absorber - 240 D 001 14_V4.pdf
Analyzing Magnet
Detector
  • BGO crystals - 6/28 - Arrived in Richmond, Deringer controls paperwork, 6/29 - DHL delivery due at JLab
  • PMT status - (4) Hamamatsu tubes w/ magnetic shield, PR 6/1, PO 6/2, due 8/2 or earlier => https://misportal.jlab.org/reqs/pr/viewPr.do?prNum=412467
  • PMT base status?
  • Detector box status?
DAQ
  • PMT-5R ItoV amplifier with remote control - 6/23 CC order placed to Advanced Instruments Corp, delivery date TBD
  • Rack- Last week? we discussed a rack layout showing all components + add/list odds/ends still needed UITF cables, connectors, patch panel, lifting bolts?, wheels?, can we finalize/order these
  • Rest of DAQ (hardware and software) - how are we looking for UITF readiness ... Like = Aug 1, Should = Sep 1, Must = Oct 1
What else?
  • NIM paper - Riad's good idea - some of us will draft an outline in overleaf, later we'll look for short technical descriptions/results,
  • Manual - More of an operational document to augment NIM paper technical description