Difference between revisions of "MOLLER PQB Meeting March 13, 2024"
Jump to navigation
Jump to search
Line 7: | Line 7: | ||
'''Agenda:''' | '''Agenda:''' | ||
− | 1- Two major MOLLER beam studies in | + | 1- Two major MOLLER beam studies in Hall A: |
− | # FFB in Hall A: | + | # FFB in Hall A: (tentatively scheduled on April 17) |
## BSList to start Hall A April run with FFB ON - Ryan Bodestein: [[media:HallA_FFB_Test_Planning.pdf]] [[media:HallA_FFB_Test_Planning.pptx]] [https://tasklists.jlab.org/bslist/tasks/111279] | ## BSList to start Hall A April run with FFB ON - Ryan Bodestein: [[media:HallA_FFB_Test_Planning.pdf]] [[media:HallA_FFB_Test_Planning.pptx]] [https://tasklists.jlab.org/bslist/tasks/111279] | ||
## BSList to measure PQB beam in Hall A helicity flip of 2 kHz and to measure monitor (BPMs, BCMs) resolution [https://tasklists.jlab.org/bslist/tasks/109569] | ## BSList to measure PQB beam in Hall A helicity flip of 2 kHz and to measure monitor (BPMs, BCMs) resolution [https://tasklists.jlab.org/bslist/tasks/109569] | ||
− | # K-Long Beam Loading: | + | # K-Long Beam Loading: (tentatively scheduled on May 1) |
## BSList to deliver 15.6 MHz beam from Hall D laser to Hall C - Riad Suleiman [https://tasklists.jlab.org/bslist/tasks/111261] | ## BSList to deliver 15.6 MHz beam from Hall D laser to Hall C - Riad Suleiman [https://tasklists.jlab.org/bslist/tasks/111261] | ||
## BSList to measure PQB beam in Injector and Hall A - Caryn Palatchi | ## BSList to measure PQB beam in Injector and Hall A - Caryn Palatchi |
Revision as of 14:44, 13 March 2024
In person in MCC Conference Room and with Zoom.
https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam
--
Agenda:
1- Two major MOLLER beam studies in Hall A:
- FFB in Hall A: (tentatively scheduled on April 17)
- BSList to start Hall A April run with FFB ON - Ryan Bodestein: media:HallA_FFB_Test_Planning.pdf media:HallA_FFB_Test_Planning.pptx [1]
- BSList to measure PQB beam in Hall A helicity flip of 2 kHz and to measure monitor (BPMs, BCMs) resolution [2]
- K-Long Beam Loading: (tentatively scheduled on May 1)
- BSList to deliver 15.6 MHz beam from Hall D laser to Hall C - Riad Suleiman [3]
- BSList to measure PQB beam in Injector and Hall A - Caryn Palatchi