Listed in order of suggested priority...
 
Listed in order of suggested priority...
  
;Re-measure emittance in order to analyze Run 1 conditions (3 hours)
+
=Re-measure emittance in order to analyze Run 1 conditions (3 hours)=
  
 
:* '''February 4, 2015:'''
 
:* '''February 4, 2015:'''
Line 8: Line 8:
 
::* Started emittance and Twiss for 5.5 MeV/c but harp is stuck so test deferred for now
 
::* Started emittance and Twiss for 5.5 MeV/c but harp is stuck so test deferred for now
  
;Test hardware TOF veto at 31MHz and 62MHz (6 hours)
+
=Test hardware TOF veto at 31MHz and 62MHz (6 hours)=
  
;Test FADC without TDC (1 hour).
+
=Test FADC without TDC (1 hour)=
  
 
:* '''February 4, 2015:''' Added two more laser timing signals to FADC. From Disc 708, OUT signal was connected to FADC Ch10 and OUT_bar was connected to Ch12. The original laser timing signal is still connected to Ch9.
 
:* '''February 4, 2015:''' Added two more laser timing signals to FADC. From Disc 708, OUT signal was connected to FADC Ch10 and OUT_bar was connected to Ch12. The original laser timing signal is still connected to Ch9.
  
;Test background as a function of target ladder position on large target foil (2 hours)
+
=Test background as a function of target ladder position on large target foil (2 hours)=
  
;Test Mott delayed operation (1 hour): a set of 10 runs while changing between No Delay and Delay=8.
+
=Test Mott delayed operation (1 hour): a set of 10 runs while changing between No Delay and Delay=8=
  
;Test new Mott DAQ Configurations (1 hour): SemiIntFast (only readout of fADC250. Blocklevel = 1) and SemiIntBlock (only readout of fADC250. Blocklevel = 50). Measure deadtime with 5 uA on 1 um gold foil.
+
=Test new Mott DAQ Configurations (1 hour): SemiIntFast (only readout of fADC250. Blocklevel = 1) and SemiIntBlock (only readout of fADC250. Blocklevel = 50). Measure deadtime with 5 uA on 1 um gold foil.=

Revision as of 18:01, 9 February 2015

Listed in order of suggested priority...

Re-measure emittance in order to analyze Run 1 conditions (3 hours)

  • February 4, 2015:
  • Identified parameters and details for a procedure
  • Measured emittance and Twiss for 6.3 MeV/c setup
  • Started emittance and Twiss for 5.5 MeV/c but harp is stuck so test deferred for now

Test hardware TOF veto at 31MHz and 62MHz (6 hours)

Test FADC without TDC (1 hour)

  • February 4, 2015: Added two more laser timing signals to FADC. From Disc 708, OUT signal was connected to FADC Ch10 and OUT_bar was connected to Ch12. The original laser timing signal is still connected to Ch9.

Test background as a function of target ladder position on large target foil (2 hours)

Test Mott delayed operation (1 hour): a set of 10 runs while changing between No Delay and Delay=8

Test new Mott DAQ Configurations (1 hour): SemiIntFast (only readout of fADC250. Blocklevel = 1) and SemiIntBlock (only readout of fADC250. Blocklevel = 50). Measure deadtime with 5 uA on 1 um gold foil.