Difference between revisions of "Development Period - February 9-10"

From Ciswikidb
Jump to navigation Jump to search
Line 24: Line 24:
 
==Test new Mott DAQ Configurations (1 hour)==
 
==Test new Mott DAQ Configurations (1 hour)==
  
:SemiIntFast (only readout of fADC250. Blocklevel = 1) and SemiIntBlock (only readout of fADC250. Blocklevel = 50). Measure deadtime with 5 uA on 1 um gold foil.
+
:SemiIntFast (only readout of fADC250. Blocklevel = 1) and SemiIntBlock (only readout of fADC250. Blocklevel = 50). Measure deadtime with 2.2 uA on 1 um gold foil.

Revision as of 20:34, 9 February 2015

Listed in order of suggested priority...

Re-measure emittance in order to analyze Run 1 conditions (3 hours)

  • February 9, 2015:
  • Identified parameters and details for a procedure
  • Measured emittance and Twiss for 6.3 MeV/c setup
  • Started emittance and Twiss for 5.5 MeV/c but harp is stuck so test deferred for now

Test hardware TOF veto at 31MHz (4 hours)

  • Runs 8210 - 8217 with 0.225 um gold foil

Test FADC time-of-flight readout (1 hour)

  • February 4, 2015:
  • Added two more laser timing signals to FADC. From Disc 708, OUT signal was connected to FADC Ch10 and OUT_bar was connected to Ch12. The original laser timing signal is still connected to Ch9.
  • Run 8224 with 1.0 um gold foil and Mott_SemiInt configuration

Test background as a function of target ladder position on large target foil (0 hours)

Test Mott delayed operation (1 hour): a set of 10 runs while changing between No Delay and Delay=8

  • Runs 8218 - 8223 with 1.0 um gold foil

Test new Mott DAQ Configurations (1 hour)

SemiIntFast (only readout of fADC250. Blocklevel = 1) and SemiIntBlock (only readout of fADC250. Blocklevel = 50). Measure deadtime with 2.2 uA on 1 um gold foil.