Line 20: | Line 20: | ||
- Measure the beam energy in the 5D line (Bubble Chamber mini-beamline) | - Measure the beam energy in the 5D line (Bubble Chamber mini-beamline) | ||
- Measure beam properties coming out of the 1/4 cryo unit | - Measure beam properties coming out of the 1/4 cryo unit | ||
− | - Achieve 8.5 MeV kinetic energy in the Injector | + | - Achieve 8.5 MeV kinetic energy in the Injector. During PEPPo, achieved 8.25 MeV/c, or 7.75 MeV kinetic energy. |
5- Dead time systematic error | 5- Dead time systematic error |
Revision as of 16:37, 18 October 2013
We will meet in TED 2561B on Wednesday October 23 at 3:00 pm EST.
For those calling in we'll use the ReadyTalk audio conference system.
1. Dial Toll-Free Number: 866-740-1260 (U.S. & Canada) 2. Enter 7-digit access code 4402297, followed by “#”
Agenda:
1- Bubble Chamber progress at Argonne
2- Progress at JLab:
- Chris Tennant will develop an ELEGANT model of the beamline and help characterize the beam coming out of the 1/4 cryo unit - Shaun Gregory started the design work for the experiment - Jay Benesch is designing a new dipole to achieve the requirements on absolute beam energy - George Kharashvili will help with the electron dump design and FLUKA simulation
3- A new "5 MeV" Dipole media:new_5Mev_dipole.pdf media:new_5Mev_dipole.doc
4- Planned beam studies this Fall:
- Measure the beam energy in the 5D line (Bubble Chamber mini-beamline) - Measure beam properties coming out of the 1/4 cryo unit - Achieve 8.5 MeV kinetic energy in the Injector. During PEPPo, achieved 8.25 MeV/c, or 7.75 MeV kinetic energy.
5- Dead time systematic error