Difference between revisions of "Wednesday October 23, 2013"

From Ciswikidb
Jump to navigation Jump to search
Line 20: Line 20:
 
   - Measure the beam energy in the 5D line (Bubble Chamber mini-beamline)
 
   - Measure the beam energy in the 5D line (Bubble Chamber mini-beamline)
 
   - Measure beam properties coming out of the 1/4 cryo unit
 
   - Measure beam properties coming out of the 1/4 cryo unit
   - Achieve 8.5 MeV kinetic energy in the Injector -
+
   - Achieve 8.5 MeV kinetic energy in the Injector. During PEPPo, achieved 8.25 MeV/c, or 7.75 MeV kinetic energy.
  
 
5- Dead time systematic error
 
5- Dead time systematic error

Revision as of 16:37, 18 October 2013

We will meet in TED 2561B on Wednesday October 23 at 3:00 pm EST.

For those calling in we'll use the ReadyTalk audio conference system.

1. Dial Toll-Free Number: 866-740-1260 (U.S. & Canada)
2. Enter 7-digit access code 4402297, followed by “#”

Agenda:

1- Bubble Chamber progress at Argonne

2- Progress at JLab:

 - Chris Tennant will develop an ELEGANT model of the beamline and help characterize the beam coming out of the 1/4 cryo unit
 - Shaun Gregory started the design work for the experiment
 - Jay Benesch is designing a new dipole to achieve the requirements on absolute beam energy
 - George Kharashvili will help with the electron dump design and FLUKA simulation

3- A new "5 MeV" Dipole media:new_5Mev_dipole.pdf media:new_5Mev_dipole.doc

4- Planned beam studies this Fall:

 - Measure the beam energy in the 5D line (Bubble Chamber mini-beamline)
 - Measure beam properties coming out of the 1/4 cryo unit
 - Achieve 8.5 MeV kinetic energy in the Injector. During PEPPo, achieved 8.25 MeV/c, or 7.75 MeV kinetic energy.

5- Dead time systematic error