Difference between revisions of "Wednesday October 23, 2013"
Jump to navigation
Jump to search
Line 7: | Line 7: | ||
Agenda: | Agenda: | ||
− | 1 | + | 1- Progress at JLab: |
− | |||
− | |||
- Chris Tennant will develop an ELEGANT model of the beamline and help characterize the beam coming out of the 1/4 cryo unit | - Chris Tennant will develop an ELEGANT model of the beamline and help characterize the beam coming out of the 1/4 cryo unit | ||
- Shaun Gregory started the design work for the experiment | - Shaun Gregory started the design work for the experiment | ||
Line 15: | Line 13: | ||
- George Kharashvili will help with the electron dump design and FLUKA simulation | - George Kharashvili will help with the electron dump design and FLUKA simulation | ||
− | + | 2- A new "5 MeV" Dipole [[media:new_5Mev_dipole.pdf]] [[media:new_5Mev_dipole.doc]] | |
− | + | 3- Planned beam studies this Fall: | |
- Measure the beam energy in the 5D line (Bubble Chamber mini-beamline) | - Measure the beam energy in the 5D line (Bubble Chamber mini-beamline) | ||
- Measure beam properties coming out of the 1/4 cryo unit | - Measure beam properties coming out of the 1/4 cryo unit | ||
Line 23: | Line 21: | ||
or 7.75 MeV kinetic energy. | or 7.75 MeV kinetic energy. | ||
− | + | 4- Dead time systematic error | |
+ | |||
+ | 5- Bubble Chamber progress at Argonne |
Revision as of 17:40, 18 October 2013
We will meet in TED 2561B on Wednesday October 23 at 3:00 pm EST.
For those calling in we'll use the ReadyTalk audio conference system.
1. Dial Toll-Free Number: 866-740-1260 (U.S. & Canada) 2. Enter 7-digit access code 4402297, followed by “#”
Agenda:
1- Progress at JLab:
- Chris Tennant will develop an ELEGANT model of the beamline and help characterize the beam coming out of the 1/4 cryo unit - Shaun Gregory started the design work for the experiment - Jay Benesch is designing a new dipole to achieve the requirements on absolute beam energy - George Kharashvili will help with the electron dump design and FLUKA simulation
2- A new "5 MeV" Dipole media:new_5Mev_dipole.pdf media:new_5Mev_dipole.doc
3- Planned beam studies this Fall:
- Measure the beam energy in the 5D line (Bubble Chamber mini-beamline) - Measure beam properties coming out of the 1/4 cryo unit - Increase gradient of 1/4 cryo unit to achieve 8.5 MeV kinetic energy in the Injector. During PEPPo, achieved 8.25 MeV/c, or 7.75 MeV kinetic energy.
4- Dead time systematic error
5- Bubble Chamber progress at Argonne