(Created page with "*The gun and vacuum chamber have been vented, the gun removed and taken to the clean room in TL 1137 for refurbishing. *Mamun and Yan are working on the cathode prep chamber,...")
 
Line 1: Line 1:
*The gun and vacuum chamber have been vented, the gun removed and taken to the clean room in TL 1137 for refurbishing.
+
* The gun and prep chamber have been vented, the gun removed and taken to the clean room in TL 1137 for refurbishing.
*Mamun and Yan are working on the cathode prep chamber, removing viewports for cleaning, stalk for modification, etc.
+
* Mamun and Yan are working on the cathode prep chamber, removing viewports for cleaning, stalk for modification, etc.
 
** Mamun has an idea for holding the puck with the top heater, this would allow for biasing the cathode and for full adjustment of the gap between the puck and the effusion source. D. Machie is looking into this...he needs a charge code....
 
** Mamun has an idea for holding the puck with the top heater, this would allow for biasing the cathode and for full adjustment of the gap between the puck and the effusion source. D. Machie is looking into this...he needs a charge code....
*The gate valve between the gun and the prep chamber has been removed also and taken to tTL 1137 for repairs, as it leaks through.
+
* The gate valve between the gun and the prep chamber has been removed also and taken to TL 1137 for repairs, as it leaks through.
*The trim cards powering the magnets have been removed, and J. Delk disconnected the solenoids and steering coils.
+
* The trim cards powering the magnets have been removed, and J. Delk disconnected the solenoids and steering coils.
*Bubba and Phil moved the beam line up against the wall.
+
* Bubba and Phil moved the beam line up against the wall.
*Jon is working on the HVPS R350 socket and un-shorting the conditioning resistor, [https://logbooks.jlab.org/entry/3419666 found tracking on the R350 socket]
+
* John is working on the HVPS R350 socket and un-shorting the conditioning resistor, [https://logbooks.jlab.org/entry/3419666 found tracking on the R350 socket]

Revision as of 12:28, 30 August 2016

  • The gun and prep chamber have been vented, the gun removed and taken to the clean room in TL 1137 for refurbishing.
  • Mamun and Yan are working on the cathode prep chamber, removing viewports for cleaning, stalk for modification, etc.
    • Mamun has an idea for holding the puck with the top heater, this would allow for biasing the cathode and for full adjustment of the gap between the puck and the effusion source. D. Machie is looking into this...he needs a charge code....
  • The gate valve between the gun and the prep chamber has been removed also and taken to TL 1137 for repairs, as it leaks through.
  • The trim cards powering the magnets have been removed, and J. Delk disconnected the solenoids and steering coils.
  • Bubba and Phil moved the beam line up against the wall.
  • John is working on the HVPS R350 socket and un-shorting the conditioning resistor, found tracking on the R350 socket