Difference between revisions of "November 13, 2013"

From Ciswikidb
Jump to navigation Jump to search
Line 2: Line 2:
 
; Polarized Source
 
; Polarized Source
 
* Laser
 
* Laser
* High Voltage
+
* High Voltage [https://logbooks.jlab.org/entry/3257980 Overcurrent Faults] and  [https://logbooks.jlab.org/entry/3258618 Operation]
  
 
; Beam and Diagnostics
 
; Beam and Diagnostics

Revision as of 07:53, 13 November 2013

500 keV Setup

Polarized Source
Beam and Diagnostics
  • Beam to PCUP
  • QE Measurement
  • HVPS calibration
  • Injector Steering (spot move, Wiens)
  • Emittance measurement

Test Plans

Brock cavity
Seed laser

Future Plans

Punchlist Media:500keV_punchlist_v2.xlsx
Schedule

Scene Preservation

Slides Media:ScenePreservation.pptx