Difference between revisions of "November 14, 2018 - Group Meeting"
Jump to navigation
Jump to search
Line 8: | Line 8: | ||
:[https://logbooks.jlab.org/entry/3621315 Hall A Laser restoring] | :[https://logbooks.jlab.org/entry/3621315 Hall A Laser restoring] | ||
:[https://logbooks.jlab.org/entry/3621950 Vertical Wien PS instability addressed] | :[https://logbooks.jlab.org/entry/3621950 Vertical Wien PS instability addressed] | ||
+ | :[https://logbooks.jlab.org/entry/3625504 Helicity board signal vs. setpoint] | ||
===2018 LERF Status=== | ===2018 LERF Status=== |
Revision as of 15:47, 13 November 2018
Fall 2018 Run, January 2019 SAD and Beyond...
2018 CEBAF Run
- Gun2 lifetime and recent QE scan
- Hall B Moller and Beam Energy
- Mott measurements
- SF6 relief valve leak
- Hall A Laser restoring
- Vertical Wien PS instability addressed
- Helicity board signal vs. setpoint
2018 LERF Status
- LERF Driver Laser Enclosure Certified
- LERF PSS Certification - Support for Gun and Laser enable
January 2019 CEBAF SAD
- Heat/Activate Gun2 Photocathode SLSP
- John ordered small tank to top off SF6
- Install RTP Pockels cell
- Implement 1kV anode safe floating bias supply inline with anode-picoammeter
- Fiducialize IHA2D00 for Bubble
- Accelerator electricians to install two new racks + cable tray in ISB for 200KV Wien HVPS and address iocin6 load