Difference between revisions of "February 21, 2019 - Weekly ME Meeting"
Jump to navigation
Jump to search
Line 17: | Line 17: | ||
: Gabriel and Josh need to learn how to run existing CEBAF GPT deck from Gun to Chopper (130 kV, cathode no-shed?, anode grounded, solenoids, Jay Wiens?) | : Gabriel and Josh need to learn how to run existing CEBAF GPT deck from Gun to Chopper (130 kV, cathode no-shed?, anode grounded, solenoids, Jay Wiens?) | ||
: Gabriel's 200kV upgrade modeling jobs | : Gabriel's 200kV upgrade modeling jobs | ||
− | :: | + | ::Incorporate small-shed to CEBAF model, use GPT to compare 130kV vs. 200kV (to compare at CEBAF when installed?) |
− | + | ::Optimize HV design for Jay's original 200KV Wien, work w/ Jay to build E/B model and evaluate in GPT, consider optical/operation improvements | |
− | ::Optimize | + | ::Work w/ Alicia to incorporate 200KV Wien models into the CEBAF upgrade deck, for testing layout we want to build |
− | ::Work w/ Alicia to incorporate into the upgrade | ||
: Josh's Ion-bombardment modeling jobs | : Josh's Ion-bombardment modeling jobs |
Revision as of 11:46, 20 February 2019
- ME Components
- Jay's solenoid media:190220_COIL.pdf
- Small-shed Gun2 assembly drawing
- ME Layouts
- Danny Gun region media:190123_gun_to_chopper.pdf
- Danny Booster region media:LAYOUT14FEB19.pdf
- Danny updated Reza layout dimensions media:Injector upgrade Choppers to Booster v01DM.pptx
- Joe Gun + Booster notes media:190123_INJ.pptx
- UITF Updates
- Booster status
- Running beam from no-shed electrode
- Status of small-shed electrode
- Modeling Updates
- Gabriel and Josh need to learn how to run existing CEBAF GPT deck from Gun to Chopper (130 kV, cathode no-shed?, anode grounded, solenoids, Jay Wiens?)
- Gabriel's 200kV upgrade modeling jobs
- Incorporate small-shed to CEBAF model, use GPT to compare 130kV vs. 200kV (to compare at CEBAF when installed?)
- Optimize HV design for Jay's original 200KV Wien, work w/ Jay to build E/B model and evaluate in GPT, consider optical/operation improvements
- Work w/ Alicia to incorporate 200KV Wien models into the CEBAF upgrade deck, for testing layout we want to build
- Josh's Ion-bombardment modeling jobs