Difference between revisions of "CEBAF Injector Upgrade"
Jump to navigation
Jump to search
Line 28: | Line 28: | ||
==ATLIS Tasks== | ==ATLIS Tasks== | ||
=== AIPINJ === | === AIPINJ === | ||
+ | * [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20404 Install Chopper SSA's] | ||
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20410 Chopper SSA LCW] | * [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20410 Chopper SSA LCW] | ||
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/19517 Penetration Drops] | * [http://devweb.acc.jlab.org/CSUEApps/atlis/task/19517 Penetration Drops] |
Revision as of 20:18, 12 March 2020
This area is related to Injector Upgrade Meetings
Injector upgrade calendar
- Run (now - May 6)
- Phase 1 (May 6 - end of 2020)
- Run (Jan 2021 - Sep 13 2021)
- Phase 2 (Sep 13 - end of 2021)
Injector Upgrade Meetings
Link to AIPINJ OneDrive folder
AIPINJ Layouts
Injector Upgrade Documents and Links
Components
ATLIS Tasks
AIPINJ
- Install Chopper SSA's
- Chopper SSA LCW
- Penetration Drops
- Testing Wien HV Controls at UITF
- Accelerator network re-survey
- Remove and re-install BPM's Gun to chopper
- Install new IPM2I03
- Remove and calibrate current monitoring electronics
- Harp work
Non-AIPINJ
- New Gun2 loading chamber
- Placeholder for Tim Minga to test laser room smoke detector alarm to MCC/Guard