Difference between revisions of "CIS Safety"

From Ciswikidb
Jump to navigation Jump to search
Line 9: Line 9:
 
* CEBAF Battery Bias Box, Draft OSP [[media:DraftOSP_Battery_bias_box_maintenance.docx]] and Task Hazard Analysis [[media:draftTHA_battery_bias_box_maintenance.docx]]
 
* CEBAF Battery Bias Box, Draft OSP [[media:DraftOSP_Battery_bias_box_maintenance.docx]] and Task Hazard Analysis [[media:draftTHA_battery_bias_box_maintenance.docx]]
  
;Official documents managed via document-control
+
;Official documents managed via document-control for CEBAF
  
 
* CEBAF Injector Power Supply SF6 Tank & 350 kV Receptacle (PS-ACC-17-001) https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-38417
 
* CEBAF Injector Power Supply SF6 Tank & 350 kV Receptacle (PS-ACC-17-001) https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-38417

Revision as of 12:46, 28 September 2020

OSPs, TOSPs and LOSPs for CEBAF

These procedures are managed via document control with links to individual procedures as shown below, but these documents can also be found using the search tool at this link: https://mis.jlab.org/mis/apps/mis_forms/search_operational_safety_procedure_forms.cfm

Official documents managed via document-control for CEBAF
  • CEBAF Industrial Hygiene Assessment for SF6 exposure evaluated June 2018 by Jennifer Williams : requested link to official assessment
Other documents not managed via document-control
  • SF6 Inventory log and calculation sheets are located at:O:\inj_group\SF6 Gas Management and Inventory