** December: re-connect beamline magnet corrector, PSS certification, re-assemble TGun enclosure
+
** December: re-connect beamline magnet corrector; re-assemble TGun enclosure; PSS certification.
** January: Beamline magnet racks and trim cards ON. Run 1 mA beam.
+
** January: disconnect turbo and add pinch-off copper tube; beamline magnet racks and trim cards ON; Run 1 mA beam.
  
  
 
* Beam Tests (if 1 mA run is successful):
 
* Beam Tests (if 1 mA run is successful):
 
** TE011 cavity test
 
** TE011 cavity test
** Vent gun HV chamber, remove Kr line, re-activate cathode, ion trapping test.
+
** Vent gun HV chamber; remove Kr line; re-activate cathode; ion trapping test.

Latest revision as of 08:52, 16 December 2020

Work plan for December - January

  • Notes:
    • LERF is getting its own magnet power supply. We have GTS Gun Solenoid power supply from now on.
    • Xelera is in no rush to take back TGun. Gun will stay at JLab as long as there is use for it.


  • Plans:
    • December: re-connect beamline magnet corrector; re-assemble TGun enclosure; PSS certification.
    • January: disconnect turbo and add pinch-off copper tube; beamline magnet racks and trim cards ON; Run 1 mA beam.


  • Beam Tests (if 1 mA run is successful):
    • TE011 cavity test
    • Vent gun HV chamber; remove Kr line; re-activate cathode; ion trapping test.