Difference between revisions of "Bubble Demo ME May 9, 2014"
Jump to navigation
Jump to search
Line 3: | Line 3: | ||
== SUMMER Installation == | == SUMMER Installation == | ||
'''DL Items''' | '''DL Items''' | ||
− | : Are DL drawings signed off? | + | : (Shaun/Joe) Are DL drawings signed off? |
− | : Identify vendor for DL? | + | : (Tim/Joe) Identify vendor for DL? |
− | : Identify vendor for DL alignment plate? | + | : (Tim/Joe/Shaun) Identify vendor for DL alignment plate? |
'''Beamline layout''' | '''Beamline layout''' | ||
− | : Part list | + | : (Joe/Shaun) Part list |
:: re-use from tunnel | :: re-use from tunnel | ||
:: on shelf | :: on shelf | ||
:: buy part | :: buy part | ||
:: design/fab part | :: design/fab part | ||
− | : Bellows arrangement | + | : (Shaun) Bellows arrangement |
− | : Modify support of "green" girder | + | : (Shaun) Modify support of "green" girder |
− | : Plan/schedule for drawings and fabrication | + | : (Shaun) Plan/schedule for drawings and fabrication |
− | : Aluminum photon dump dimensions | + | : (Riad) Aluminum photon dump dimensions |
'''Beamline components''' | '''Beamline components''' | ||
− | : Are MBH corrector strengths sufficient? | + | : (Joe) Are MBH corrector strengths sufficient? |
− | : Is radiator cooling flange sufficient? | + | : (Joe M.) Is radiator cooling flange sufficient? |
'''Bubble Chamber Alignment''' | '''Bubble Chamber Alignment''' | ||
− | : Mounting in tunnel | + | : (Riad/Brad/Shaun) Mounting in tunnel |
− | : Chamber alignment capability | + | : (Riad/Brad/Shaun) Chamber alignment capability |
== FINAL installation == | == FINAL installation == | ||
: Identify suitable dump dipole and its dimensions | : Identify suitable dump dipole and its dimensions |
Revision as of 15:23, 1 May 2014
We will meet Friday May 9 @ 9am in TL-2236.
SUMMER Installation
DL Items
- (Shaun/Joe) Are DL drawings signed off?
- (Tim/Joe) Identify vendor for DL?
- (Tim/Joe/Shaun) Identify vendor for DL alignment plate?
Beamline layout
- (Joe/Shaun) Part list
- re-use from tunnel
- on shelf
- buy part
- design/fab part
- (Shaun) Bellows arrangement
- (Shaun) Modify support of "green" girder
- (Shaun) Plan/schedule for drawings and fabrication
- (Riad) Aluminum photon dump dimensions
Beamline components
- (Joe) Are MBH corrector strengths sufficient?
- (Joe M.) Is radiator cooling flange sufficient?
Bubble Chamber Alignment
- (Riad/Brad/Shaun) Mounting in tunnel
- (Riad/Brad/Shaun) Chamber alignment capability
FINAL installation
- Identify suitable dump dipole and its dimensions