(Created page with "New BPM's were developed for the 200 kV gun NEG tube beam line. Please see Region 1 released drawings for prints. ;Performance Notes * BPM #1 * BPM #2 * BPM #3 * BPM #4 ;De...")
 
Line 1: Line 1:
 
New BPM's were developed for the 200 kV gun NEG tube beam line.
 
New BPM's were developed for the 200 kV gun NEG tube beam line.
  
Please see Region 1 released drawings for prints.
+
== ME Design ==
 +
*weldment [[media:JL0091130-0114 BPM TUBE WELDMENT, REV-.pdf]]
  
;Performance Notes
 
* BPM #1
 
* BPM #2
 
* BPM #3
 
* BPM #4
 
  
;Design and draft notes
+
== Gabou Measurements ==
*weldment [[media:JL0091130-0114 BPM TUBE WELDMENT, REV-.pdf]]
+
 
 +
* NEG BPM #1
 +
* NEG BPM #2
 +
* NEG BPM #3
 +
* NEG BPM #4
  
 +
== Assembly ==
 
;Assembly sequence
 
;Assembly sequence
* Receive can/feedthroughs
+
# Receive can/feedthroughs
* Clean
+
# Clean
* Degas
+
# Degas
* NEG Coat
+
# NEG Coat
* Check feedthroughs
+
# Check feedthroughs
* Assemble feedthroughs
+
# Assemble feedthroughs
* serialize
+
# serialize
* Leak check cans
+
# Leak check cans
* electrical measurement
+
# electrical measurement
* report K's and center
+
# report K's and center

Revision as of 16:09, 14 June 2021

New BPM's were developed for the 200 kV gun NEG tube beam line.

ME Design


Gabou Measurements

  • NEG BPM #1
  • NEG BPM #2
  • NEG BPM #3
  • NEG BPM #4

Assembly

Assembly sequence
  1. Receive can/feedthroughs
  2. Clean
  3. Degas
  4. NEG Coat
  5. Check feedthroughs
  6. Assemble feedthroughs
  7. serialize
  8. Leak check cans
  9. electrical measurement
  10. report K's and center