Difference between revisions of "Beamline viewers"

From Ciswikidb
Jump to navigation Jump to search
Line 1: Line 1:
The viewers on each girder go like this:
+
Phase 1 included upgrading 8 viewer assemblies.
  
;By girder
+
; Installation by harp
:Y-chamber : two
+
* ITV2I01 @ Y-chamber (chromox w/ 10 mm hole), w/ top-hat, retracts into tack welded tube, standard rod, new bellows
:Wien girder : four
+
* ITV1I02 @ Laser-chamber (chromox no hole), w/ top-hat, retracts into tack welded tube, standard rod, new bellows
:A1/A2 girder : two
+
* ITV1I03 @ V-Wien entrance (chromox no hole), w/ top-hat - requires long extension rod, new bellows
 +
* ITV1I04 @ V-Wien exit (chromox no hole), w/ top-hat - requires long extension rod, new bellows
 +
* ITV1I05 @ H-Wien entrance (chromox no hole), w/ top-hat - requires long extension rod, new bellows
 +
* ITV1I06 @ H-Wien exit (chromox no hole), w/ top-hat - requires long extension rod, new bellows
 +
* ITV0I01 @ Pcup (chromox no hole), w/top-hat - standard rod, new bellows
 +
* ITV0I02 @ Harp (YAG w/ 5m and 10mm square marking), removing top-hat interference w/ harp - standard rod, new bellows
  
;By screen
+
; Engineering
: Laser => chromox w/ 10mm hole
+
* New air cylinder modifications [[media:210115_ViewerOptions.docx]]
: At harp => YAG
+
* New viewer drawings https://wiki.jlab.org/ciswiki/index.php/Viewers
: All others => chromox no hole
 
 
 
;By screen assembly
 
: All have a shield at base of screen
 
: Laser and Y retract into tack welded tube
 
 
 
;Viewer assembly info
 
: all bellows replaced
 
: status Jan 15, 2021
 
::: Y/Laser installed in tunnel
 
::: (4) Wien => require extension rod
 
::: (2) A1/A2 => standard rod
 
::: New air cylinder modifications [[media:210115_ViewerOptions.docx]]
 
 
 
https://wiki.jlab.org/ciswiki/index.php/Viewers
 

Revision as of 16:28, 17 June 2021

Phase 1 included upgrading 8 viewer assemblies.

Installation by harp
  • ITV2I01 @ Y-chamber (chromox w/ 10 mm hole), w/ top-hat, retracts into tack welded tube, standard rod, new bellows
  • ITV1I02 @ Laser-chamber (chromox no hole), w/ top-hat, retracts into tack welded tube, standard rod, new bellows
  • ITV1I03 @ V-Wien entrance (chromox no hole), w/ top-hat - requires long extension rod, new bellows
  • ITV1I04 @ V-Wien exit (chromox no hole), w/ top-hat - requires long extension rod, new bellows
  • ITV1I05 @ H-Wien entrance (chromox no hole), w/ top-hat - requires long extension rod, new bellows
  • ITV1I06 @ H-Wien exit (chromox no hole), w/ top-hat - requires long extension rod, new bellows
  • ITV0I01 @ Pcup (chromox no hole), w/top-hat - standard rod, new bellows
  • ITV0I02 @ Harp (YAG w/ 5m and 10mm square marking), removing top-hat interference w/ harp - standard rod, new bellows
Engineering