Difference between revisions of "2021-07-07"
Jump to navigation
Jump to search
Line 22: | Line 22: | ||
<u>Short term schedule update:</u><br> | <u>Short term schedule update:</u><br> | ||
<u>This week:</u> | <u>This week:</u> | ||
− | * [https://logbooks.jlab.org/entry/3883030 Harp and NEG installed in MeV Spectrometer Line] | + | * [https://logbooks.jlab.org/entry/3883030 Harp and NEG installed in MeV Spectrometer Line], [logbooks.jlab.org/entry/3883225 leak checked good]. |
− | * Corrector / Raster installation - completed; turned over to | + | * [https://logbooks.jlab.org/entry/3883526 Corrector installation & cable reroute mostly complete], turned over to DC power |
+ | * [https://logbooks.jlab.org/entry/3883569 BPM cabling rerouted & RF modules installed]; turned over to IC/Software for integration | ||
+ | * Raster installation - completed; turned over to Bill Gunning | ||
* Build 80/20 support structure for Pb (Completed) | * Build 80/20 support structure for Pb (Completed) | ||
* Pb stacked; some modification possibly required. RCG/ME discussing. | * Pb stacked; some modification possibly required. RCG/ME discussing. | ||
* Install target mechanism (Completed) - Survey required | * Install target mechanism (Completed) - Survey required | ||
* EES may start cabling downstream section & making UED updates. | * EES may start cabling downstream section & making UED updates. | ||
− | * Ready to install Al base plates for FC3 region rework as well as solenoid stand. | + | * Ready to install Al base plates for FC3 region rework as well as solenoid stand. [https://logbooks.jlab.org/entry/3883262 80/20 reworked for support] |
* [[media:Engineering-support-jobs.docx| List of Engineering Jobs remaining]] | * [[media:Engineering-support-jobs.docx| List of Engineering Jobs remaining]] | ||
Latest revision as of 10:40, 19 July 2021
Meeting Information
Connecting
To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/946721076.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 946721076.
- To join via phone, use one of the following numbers and the Conference ID: 946721076.
- Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada
Agenda
Schedule
Long Term Schedule: Gantt (Outstanding tasks)
- Supplementary Shielding Installation: ???
- Beamline Commissioning / Test Plans / Shielding Verification
- 7/26/21 Start Hot Check-out
- Commission new beam line and execute experiment
- Science!!!
New items for discussion:
Short term schedule update:
This week:
- Harp and NEG installed in MeV Spectrometer Line, [logbooks.jlab.org/entry/3883225 leak checked good].
- Corrector installation & cable reroute mostly complete, turned over to DC power
- BPM cabling rerouted & RF modules installed; turned over to IC/Software for integration
- Raster installation - completed; turned over to Bill Gunning
- Build 80/20 support structure for Pb (Completed)
- Pb stacked; some modification possibly required. RCG/ME discussing.
- Install target mechanism (Completed) - Survey required
- EES may start cabling downstream section & making UED updates.
- Ready to install Al base plates for FC3 region rework as well as solenoid stand. 80/20 reworked for support
- List of Engineering Jobs remaining
Gun work progressing well:
Still to do:
- Add Mu metal over bellows on wastewater line.
Next Week:
- Mount bottle rack in Labyrinth (Staged); remove gas bottles to rack.
- Unistrut mounting for cables - Neal will do when available
- Engineering work on beam line starting
2 weeks:
- Pull Heliax from Spectrum analyzer/Control room >> Buncher
- 4th terminal system in Control room under assembly/rebuild
- Items from To-do list...
Engineering Other business
Reports on Open Action Items:
Action Items:
- Formal run plan (McCaughan) Strawman