Difference between revisions of "Meeting 9/21/22 - COMTRA"

From Ciswikidb
Jump to navigation Jump to search
(Created page with ";Thursday's @ 9am EDT by Zoom * Join ZoomGov Meeting - https://jlab-org.zoomgov.com/j/1601906056?pwd=V2xxUjJhQWN3RC91M2ZBOUVrbmhnUT09 * Zoom ID: 160 190 6056 and Passcode: 992...")
 
Line 8: Line 8:
  
 
* ME/Layout
 
* ME/Layout
** updated songsheet and quick reference, matching UED
+
** Mike/Eric completed quick reference => ME can use to populate songsheet
** dimensions when needed for S&A or Greg's Geant4 model
+
** Matt working with SCMB & RadCon (100 nA shielded hut, 25 nA unshielded hut)
** RadCon approval for lead wall, and experiment hut
 
  
 
* Experiment components
 
* Experiment components
** collimator installed and aligned
+
** collimator installed and aligned =>
 
** magnet measurement, status for install
 
** magnet measurement, status for install
** detector assembly, fiducialization
+
** detector assembly, fiducialization => walkthrough completed wit
  
 
* I&C jobs
 
* I&C jobs
** Remote motion control for aperture (otherwise do by hand w/ access)
+
** Remote motion control for aperture (otherwise do by hand w/ access) => done
** Attach current monitors to aperture and dump
+
** Attach current monitors to aperture and dump => done
** Plumb LCW for current monitor and dump
+
** Plumb LCW for current monitor and dump => done 0.75 gpm, SSG update FSD text
** Pull 6 fibers from DAQ to mezzanine
+
** Pull 6 fibers from DAQ to mezzanine => not yet
** Align x-ray camera for x-ray card after collimator
+
** Align x-ray camera for x-ray card after collimator => ?
 +
** Insertable 1/2-waveplate
 +
** pull Heliax to gun rack => done, cable #10
  
 
* DAQ/Controls
 
* DAQ/Controls

Revision as of 19:55, 21 September 2022

Thursday's @ 9am EDT by Zoom

Readiness Updates

  • ME/Layout
    • Mike/Eric completed quick reference => ME can use to populate songsheet
    • Matt working with SCMB & RadCon (100 nA shielded hut, 25 nA unshielded hut)
  • Experiment components
    • collimator installed and aligned =>
    • magnet measurement, status for install
    • detector assembly, fiducialization => walkthrough completed wit
  • I&C jobs
    • Remote motion control for aperture (otherwise do by hand w/ access) => done
    • Attach current monitors to aperture and dump => done
    • Plumb LCW for current monitor and dump => done 0.75 gpm, SSG update FSD text
    • Pull 6 fibers from DAQ to mezzanine => not yet
    • Align x-ray camera for x-ray card after collimator => ?
    • Insertable 1/2-waveplate
    • pull Heliax to gun rack => done, cable #10
  • DAQ/Controls
    • Helicity generator
    • High Voltage
    • EFADC/DAQ
    • Kepco PS
  • Experiment sequence
    • Pre-Beam - complete HCO, magnet ready, assembly detector ready, fiducial them, mock-up install ?, remove temporarily
    • Commission - setup beam to FCUP, APERTURE, DUMP and use x-ray card to define orbit to collimator
    • Experiment - install/align magnet/detector (w/ attenuators?), deliver x-rays, optimize DAQ, measure asymmetry vs. XYZ and with Wien