* Joe announcements | * Joe announcements | ||
− | ** Early timesheet on Wed 12/14 | + | ** Early timesheet on Wed 12/14 for work planned through 12/15 |
+ | ** Holiday timesheets | ||
*** Holidays - Dec. 23, 26, 30 and Jan. 2 (holidays) | *** Holidays - Dec. 23, 26, 30 and Jan. 2 (holidays) | ||
− | *** Shutdown - Dec. 27, 28, 29 (vacation, LWOP | + | *** Shutdown - Dec. 27, 28, 29 (vacation, LWOP) |
* Updates | * Updates |
Revision as of 10:07, 13 December 2022
Agenda
- Joe announcements
- Early timesheet on Wed 12/14 for work planned through 12/15
- Holiday timesheets
- Holidays - Dec. 23, 26, 30 and Jan. 2 (holidays)
- Shutdown - Dec. 27, 28, 29 (vacation, LWOP)
- Updates
- 200 kV gun job at UITF (Marcy, Jessica, Phil, Carlos),
- Plan for CEBAF from now until the SAD begins (Shukui, Steve, Riad),
- Update on the R&D in GTS (Gabriel) and TL1137 (Mamun, Marcy),
- JLAB/SLAC/KEK e-/e+ R&D proposal (Andriy, Carlos, Joe, Mamun, Reza, Silviu) media:US-Japan-Topics.pptx
- Plan to irradiate target foils with e- beam and laser at LERF Lab 6 (Andriy, Shukui, Silviu, Sandesh, Mamun) media:2022-12-13-Target-Tests.pptx
- IPAC'23
- M. Rahman et al., "Quantum Efficiency and Lifetime Study for Negative Electron Affinity GaAs Nanopillar Array Photocathode" media:IPAC23 abstract_Aziz.pdf
- G. Blume et al., "A 5 MeV Compton transmission polarimeter designed for a SRF photogun". media:abstract-1233.pdf
- J. Grames et al., "Status of Ce+BAF: Polarized Positron Beam Capability at CEBAF 12 GeV" media:abstract-1313.pdf
- A. Ushakov et al, "Conceptual Design of a High-Power Target for Positron Production at CEBAF" media:abstract-1794.pdf
- S. Zhang, "What We Learned From Operating Electron Accelerators with Variable bunch Frequencies at JLab" media:IPAC23 abstract_Zhang.pdf
- FY23 projects - media:FY23-ACCCIS-Jobs.docx