Difference between revisions of "Data Acquisition System"
Jump to navigation
Jump to search
Line 34: | Line 34: | ||
Select '''ET System''', '''Event Builder''', '''Event Recorder''' and '''Run Control'''. | Select '''ET System''', '''Event Builder''', '''Event Recorder''' and '''Run Control'''. | ||
− | After doing that if you will click on '''Get Status''' you will find status of ''' | + | After doing that if you will click on '''Get Status''' you will find status of ''' ER1''', '''EB1''' and '''ROC1'''. All buttons must be green. |
Select '''Run Control''' and the main CODA panel will appear. | Select '''Run Control''' and the main CODA panel will appear. |
Revision as of 08:03, 28 June 2013
DAQ Hardware
- Electronic Map of Mott Crates (January 29, 2013):
Media:ElectronicsMap_20130129.pdf
Media:ElectronicsMap_20130129.ppt
- Cabling of FADC, Scalers, and TDC (January 29, 2013):
- DAQ Timing (January 29, 2013):
Media:DAQ_Timing_20130129.pptx
How to run CODA
- From an accelerator machine: ssh -X idaq@opsmdaq0 (Note: idaq is the injector DAQ account and uses ssh authorized_keys for login - no need to enter password) and open few xterm & windows.
xterm 1: telnet iocmdaq1
xterm 2: msqld (the msqld database is usually running unless opsmdaq0 was rebooted)
xterm 3: platform
xterm 4: codamaster
Choose the configuration: Mott_Sample
When the CODA MASTER panel appears, select Config => Enable Buttons.
Select ET System, Event Builder, Event Recorder and Run Control. After doing that if you will click on Get Status you will find status of ER1, EB1 and ROC1. All buttons must be green.
Select Run Control and the main CODA panel will appear.
Start and Stop a Run
After the opening of the Run Control panel, select in order:
- Sessions => inj
- Configurations => Cool => Mott_Sample
- Platform => Connect
- Configure
- Download
- Prestart
- Start
At the end:
- Stop
and if you want to apply a change or you need a new configuration:
- Reset
and start from number 5.