Difference between revisions of "Development Period - February 9-10"
Jump to navigation
Jump to search
Line 19: | Line 19: | ||
==Test Mott delayed operation (1 hour): a set of 10 runs while changing between No Delay and Delay=8== | ==Test Mott delayed operation (1 hour): a set of 10 runs while changing between No Delay and Delay=8== | ||
+ | :* ''' Runs 8218 - 8226 with 1.0 um gold foil''' | ||
==Test new Mott DAQ Configurations (1 hour)== | ==Test new Mott DAQ Configurations (1 hour)== | ||
:SemiIntFast (only readout of fADC250. Blocklevel = 1) and SemiIntBlock (only readout of fADC250. Blocklevel = 50). Measure deadtime with 5 uA on 1 um gold foil. | :SemiIntFast (only readout of fADC250. Blocklevel = 1) and SemiIntBlock (only readout of fADC250. Blocklevel = 50). Measure deadtime with 5 uA on 1 um gold foil. |
Revision as of 19:11, 9 February 2015
Listed in order of suggested priority...
Re-measure emittance in order to analyze Run 1 conditions (3 hours)
- February 9, 2015:
- Identified parameters and details for a procedure
- Measured emittance and Twiss for 6.3 MeV/c setup
- Started emittance and Twiss for 5.5 MeV/c but harp is stuck so test deferred for now
Test hardware TOF veto at 31MHz (4 hours)
- Runs 8210 - 8217 with 0.225 um gold foil
Test FADC without TDC (1 hour)
- February 4, 2015:
- Added two more laser timing signals to FADC. From Disc 708, OUT signal was connected to FADC Ch10 and OUT_bar was connected to Ch12. The original laser timing signal is still connected to Ch9.
Test background as a function of target ladder position on large target foil (0 hours)
Test Mott delayed operation (1 hour): a set of 10 runs while changing between No Delay and Delay=8
- Runs 8218 - 8226 with 1.0 um gold foil
Test new Mott DAQ Configurations (1 hour)
- SemiIntFast (only readout of fADC250. Blocklevel = 1) and SemiIntBlock (only readout of fADC250. Blocklevel = 50). Measure deadtime with 5 uA on 1 um gold foil.