By Nov. 9th the following things MUST be accomplished.
 +
 +
1. CW beam to the inline dump 85uA from A laser, 1uA from the D laser
 +
 +
2. Wien setup for alignment of polarization to Hall-A on 5-pass
 +
 +
3. Quads, solenoids centered (where appropriate) and the determined BPMs SOF loaded, see item 6
 +
 +
4. Beam matched in the inj. chicane, ready for transport into the NL.
 +
 +
5. All lasers should produce beam with the same TWISS/emittance values as measured in the inj. chicane
 +
 +
6. RF calibration tool fully developed (anticipate Nov. 2-7 DAYS)
 +
 +
7. quad centering tool fully developed (anticipate Nov. 2-7 DAYS)
 +
 
Injector Tests and Calendar [[media:150929_InjectorTestList.xlsx]] [[media:150929_InjectorTestList.pdf]]
 
Injector Tests and Calendar [[media:150929_InjectorTestList.xlsx]] [[media:150929_InjectorTestList.pdf]]

Revision as of 11:27, 30 September 2015

By Nov. 9th the following things MUST be accomplished.

1. CW beam to the inline dump 85uA from A laser, 1uA from the D laser

2. Wien setup for alignment of polarization to Hall-A on 5-pass

3. Quads, solenoids centered (where appropriate) and the determined BPMs SOF loaded, see item 6

4. Beam matched in the inj. chicane, ready for transport into the NL.

5. All lasers should produce beam with the same TWISS/emittance values as measured in the inj. chicane

6. RF calibration tool fully developed (anticipate Nov. 2-7 DAYS)

7. quad centering tool fully developed (anticipate Nov. 2-7 DAYS)