Difference between revisions of "GTS meeting 11 13 15"
Jump to navigation
Jump to search
(Created page with "media:Yan's shed version 2.0 as drawn by Danny.pdf our to-do list for Plan Z includes: detail the nipple and tapered section, the spool piece to position the ball electr...") |
|||
Line 12: | Line 12: | ||
[[media:copper "plunger" adapter to connect electrode to big insulator.pdf]] | [[media:copper "plunger" adapter to connect electrode to big insulator.pdf]] | ||
+ | |||
[[media:the top-hat shaped piece that holds the R350 receptacle and forms the SF6 volume.pdf]] | [[media:the top-hat shaped piece that holds the R350 receptacle and forms the SF6 volume.pdf]] | ||
+ | |||
[[media: clamps to hold the top hat piece on the big flange with two knife edges on one side.pdf]] | [[media: clamps to hold the top hat piece on the big flange with two knife edges on one side.pdf]] | ||
+ | |||
[[media:big flange with two knife edges on one side.pdf]] | [[media:big flange with two knife edges on one side.pdf]] |
Revision as of 09:28, 13 November 2015
media:Yan's shed version 2.0 as drawn by Danny.pdf
our to-do list for Plan Z includes:
detail the nipple and tapered section, the spool piece to position the ball electrode in correct location the shed still needs to be detailed and made the ball electrode needs to be modified with a bigger hole have the machine shop taper the plastic R350 receptacle
These parts are made:
media:copper "plunger" adapter to connect electrode to big insulator.pdf
media:the top-hat shaped piece that holds the R350 receptacle and forms the SF6 volume.pdf
media: clamps to hold the top hat piece on the big flange with two knife edges on one side.pdf