Difference between revisions of "GTS meeting 4 12 16"
Jump to navigation
Jump to search
Line 16: | Line 16: | ||
* GTS Schedule including LERF CIS requests | * GTS Schedule including LERF CIS requests | ||
− | ** [[Media:GTS gun, cathode chamber, beamline & magnetized beam.pdf]] | + | ** [[Media:GTS gun, cathode chamber, beamline & magnetized beam pic.pdf]] |
**[[Media:Dark Light FY16-17 schedule v2.pdf]] | **[[Media:Dark Light FY16-17 schedule v2.pdf]] |
Revision as of 10:00, 12 April 2016
- Beamline
- Viewer solenoid control boxes have been wired up and installed.
- Bubba is working on the instrument air line
- Cathode prep chamber
- Electricians are installing the 100A 50 VDC PS for the Sb deposition
- Mamun has mounted most of the components in the rack along with the computer
- High voltage conditioning. [1]
- Kr processing up to 325 kV. Soaking overnight at 300 kV reduced FE from 1000 CPS to < 50 CPS.
- Needs more processing
- Barrel polishing surface characterization: Media:Surface characterization summary.pptx
- Chris Gould completed the set of samples (anodes and 1cmx1cm samples) characterization using optical ellipsometry
- Mamun is studying the square samples with the AFM, EDS, etc.
- GTS Schedule including LERF CIS requests