* Carlos presented this summary/update after the LERF weekly meeting today at the MCC. It was very well received by everyone
 +
** [[Media:GTS overview and status presented at MCC on May 2 2016.pptx]]
 +
 +
* Beamline
 +
** Viewers are functional with EPICS control, but need analog video cameras. J. Gubeli working on this
 +
** Vacuum UHV signals from all six pumps are now in EPICS
 +
** Magnets have been wired up, control EPICS screen is done. Need update on what is needed before powering up each magnet.
 +
** Dump. Bubba is piping the LCW line. Need a flowmeter from P. Francis with electrical output for MPS.
 +
** Checkout the screens here: [https://logbooks.jlab.org/entry/3403401]
 +
 +
* Laser
 +
** Shukui has aligned the laser to the gun chamber entrance viewport!
 +
** The variable attenuator working now, in this case an ND with fixed OD is not needed unless you are putting it into the viewer  assembly.
 +
** The cables for pico-motors, for laser camera, for power meter signals, seem to be missing/used by others, it'll be great if Jim's crew can help  to sort out.
 +
** The GTS drive laser control is not working except the motor control. Shukui  talked with Wes last week, he agreed to help with the GTS DL EPICS together with one of Pam's group members.
 +
 +
* Cathode
 +
** Mamun has made a cathode, this time on the puck!
 +
** The QE is below 1%, but will be ideal for first beam!
 +
 +
* Other..
 +
** There is no computer with EPICS in the GET cave, which is not  really convenient when checking things out there.
 +
 
* Drawings of the new puck for magnetized beam:
 
* Drawings of the new puck for magnetized beam:
 
: [[media:haysg_JL0035765-LDRD_PUCK_STEEL_PLUG_ASSY.pdf]]
 
: [[media:haysg_JL0035765-LDRD_PUCK_STEEL_PLUG_ASSY.pdf]]
 
: [[media:haysg_JL0035913-LDRD_PUCK_BODY_NEW.pdf]]
 
: [[media:haysg_JL0035913-LDRD_PUCK_BODY_NEW.pdf]]
 
: [[media:haysg_JL0035916-LDRD_PUCK_PLUG_BODY.pdf]]
 
: [[media:haysg_JL0035916-LDRD_PUCK_PLUG_BODY.pdf]]

Revision as of 12:10, 3 May 2016

  • Beamline
    • Viewers are functional with EPICS control, but need analog video cameras. J. Gubeli working on this
    • Vacuum UHV signals from all six pumps are now in EPICS
    • Magnets have been wired up, control EPICS screen is done. Need update on what is needed before powering up each magnet.
    • Dump. Bubba is piping the LCW line. Need a flowmeter from P. Francis with electrical output for MPS.
    • Checkout the screens here: [1]
  • Laser
    • Shukui has aligned the laser to the gun chamber entrance viewport!
    • The variable attenuator working now, in this case an ND with fixed OD is not needed unless you are putting it into the viewer assembly.
    • The cables for pico-motors, for laser camera, for power meter signals, seem to be missing/used by others, it'll be great if Jim's crew can help to sort out.
    • The GTS drive laser control is not working except the motor control. Shukui talked with Wes last week, he agreed to help with the GTS DL EPICS together with one of Pam's group members.
  • Cathode
    • Mamun has made a cathode, this time on the puck!
    • The QE is below 1%, but will be ideal for first beam!
  • Other..
    • There is no computer with EPICS in the GET cave, which is not really convenient when checking things out there.
  • Drawings of the new puck for magnetized beam:
media:haysg_JL0035765-LDRD_PUCK_STEEL_PLUG_ASSY.pdf
media:haysg_JL0035913-LDRD_PUCK_BODY_NEW.pdf
media:haysg_JL0035916-LDRD_PUCK_PLUG_BODY.pdf