MOLLER PQB Meeting December 11, 2024

From Ciswikidb
Revision as of 06:16, 17 December 2024 by Suleiman (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

In person in MCC Conference Room and with Zoom.

https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam

--


Agenda:


  • Injector Beam Studies:
  1. Parasitic Parity DAQ checkout and training to 1D: Saturday December 14th Day and Swing shifts. During this time a photocathode lifetime measurement at 200 µA is scheduled.
  2. MOLLER DAQ tests to 1D at 65 µA: Sunday December 15th Day and Swing shifts. At this time, MOLLER can change beam current, Helicity Board settings, etc.