By Nov. 9th the following things MUST be accomplished.
#CW beam to the inline dump 85uA from A laser, 1uA from the D laser #Wien setup for alignment of polarization to Hall-A on 5-pass #Quads, solenoids centered (where appropriate) and the determined BPMs SOF loaded, see item 6 #Beam matched in the inj. chicane, ready for transport into the NL. #All lasers should produce beam with the same TWISS/emittance values as measured in the inj. chicane #RF calibration tool fully developed (anticipate Nov. 2-7 DAYS) #quad centering tool fully developed (anticipate Nov. 2-7 DAYS)
Injector Tests and Calendar media:150929_InjectorTestList.xlsx media:150929_InjectorTestList.pdf