GTS meeting 12 14 20
Jump to navigation
Jump to search
Work plan for December - January
- Notes:
- LERF is getting its own magnet power supply. We have GTS Gun Solenoid power supply from now on.
- Xelera is in no rush to take back TGun. Gun will stay at JLab as long as there is use for it.
- Plans:
- December: re-connect beamline magnet corrector, PSS certification, re-assemble TGun enclosure
- January: Beamline magnet racks and trim cards ON. Run 1 mA beam.
- Beam Tests (if 1 mA run is successful):
- TE011 cavity test
- Vent gun HV chamber, remove Kr line, re-activate cathode, ion trapping test.