NEG coated 2.5 inch OD BPM's

From Ciswikidb
Revision as of 16:24, 14 June 2021 by Grames (talk | contribs)
Jump to navigation Jump to search

200 KV BPM's with NEG coating

ME Design

Assembly Sequence

  1. Receive can/feedthroughs
  2. Clean
  3. Degas
  4. NEG Coat
  5. Check feedthroughs
  6. Assemble feedthroughs
  7. Serialize
  8. Leak check cans
  9. Electrical measurement
  10. Report K's and center

Electrical Measurements (K's, center, and linearity plots)