Beamline viewers
Jump to navigation
Jump to search
Phase 1 included upgrading 8 viewer assemblies.
- Visualizing the viewers
- List of viewers by installation section media:210616_Injector Phase I Viewer List.xlsx
- 3d visualization of viewers from beam's and camera's points of view media:210616_PHASE 1 VIEWERS.pptx
- Installation by viewer
- ITV2I01 @ Y-chamber (chromox w/ 10 mm hole), w/ top-hat, retracts into tack welded tube, standard rod, new bellows
- ITV1I02 @ Laser-chamber (chromox no hole), w/ top-hat, retracts into tack welded tube, standard rod, new bellows
- ITV1I03 @ V-Wien entrance (chromox no hole), w/ top-hat - requires long extension rod, new bellows
- ITV1I04 @ V-Wien exit (chromox no hole), w/ top-hat - requires long extension rod, new bellows
- ITV1I05 @ H-Wien entrance (chromox no hole), w/ top-hat - requires long extension rod, new bellows
- ITV1I06 @ H-Wien exit (chromox no hole), w/ top-hat - requires long extension rod, new bellows
- ITV0I01 @ Pcup (chromox no hole), w/top-hat - standard rod, new bellows
- ITV0I02 @ Harp (YAG w/ 5m and 10mm square marking), removing top-hat interference w/ harp - standard rod, new bellows
- Engineering
- New air cylinder modifications media:210115_ViewerOptions.docx
- New viewer drawings https://wiki.jlab.org/ciswiki/index.php/Viewers