Development Period - February 9-10
Jump to navigation
Jump to search
Listed in order of suggested priority...
Re-measure emittance in order to analyze Run 1 conditions (3 hours)
- February 9, 2015:
- Identified parameters and details for a procedure
- Measured emittance and Twiss for 6.3 MeV/c setup
- Started emittance and Twiss for 5.5 MeV/c but harp is stuck so test deferred for now
Test hardware TOF veto at 31MHz (4 hours)
- Runs 8210 - 8217 with 0.225 um gold foil
Test FADC time-of-flight readout (1 hour)
- February 4, 2015:
- Added two more laser timing signals to FADC. From Disc 708, OUT signal was connected to FADC Ch10 and OUT_bar was connected to Ch12. The original laser timing signal is still connected to Ch9.
- Run 8224 with 1.0 um gold foil
Test background as a function of target ladder position on large target foil (0 hours)
Test Mott delayed operation (1 hour): a set of 10 runs while changing between No Delay and Delay=8
- Runs 8218 - 8223 with 1.0 um gold foil
Test new Mott DAQ Configurations (1 hour)
- SemiIntFast (only readout of fADC250. Blocklevel = 1) and SemiIntBlock (only readout of fADC250. Blocklevel = 50). Measure deadtime with 5 uA on 1 um gold foil.