our to-do list for Plan Z includes:

detail the nipple and tapered section, the spool piece to position the ball electrode in correct location the shed still needs to be detailed and made the ball electrode needs to be modified with a bigger hole have the machine shop taper the plastic R350 receptacle


These parts are made:

media:copper "plunger" adapter to connect electrode to big insulator.pdf media:the top-hat shaped piece that holds the R350 receptacle and forms the SF6 volume.pdf media: clamps to hold the top hat piece on the big flange with two knife edges on one side.pdf media:big flange with two knife edges on one side.pdf