GTS meeting 3 1 16

From Ciswikidb
Revision as of 09:31, 29 February 2016 by Chgarcia (talk | contribs)
Jump to navigation Jump to search
  • Latest Drawings:
  • The cathode prep chamber is under vacuum with two puck (bulk GaAs) + the puck inside the gun
    • The bottom cathode heater works.
    • We have tested several puck transfer maneuvers.
    • Need to adapt motor to bottom heater
    • We will bring the rack from Mamun's depo chamber in the vacuum lab to the GTS for now, including the computer.
    • The chamber is ready for bake.
  • Prep Chamber, Gun & Beamline 02.jpgPrep Chamber, Gun & Beamline 04.jpg
  • Shed barrel polishing update.
    • Shed #1 was hand polished by Bubba with 320 grit sandpaper, then put into the barrel polisher for ~ 1 hr with corncob. Shed #2 was utilized just as a counterweight immersed in corncob and straight out of the machine shop with no further surface treatment. The results: Shed 1 comes out looking as if it were DPP, shed #2 comes out mirror finish, but the machining markings can still be seen, and the polishing scratches (inherent to the corncob / polishing media) are more easily seen.
    • So, the procedure so far: polish with 320 grit sand paper, then ~ 1 hr in the barrel polisher with corncob.
    • Next, Try cones instead of 320g grit sand paper.
    • Yan's optimized shed next to UITF ball electrode before barrel polishing
    • Yan's Shed pre-barrel polishing next to ball.jpg
    • Yan's optimized shed next to UITF ball electrode after barrel polishing
    • Yan's Shed after 320 grit & 1hr corncob barrel polish next to ball.jpg