Search results

Jump to navigation Jump to search

Page title matches

Page text matches

  • #status of Y-chamber...is it leak free, how did the bake go? NEGs ordered good, do you want a n #status of Load chamber...parts from machine shop look OK? order those strap nuts yet? wait too
    754 bytes (134 words) - 17:00, 7 August 2019
  • ; Pre-SAD as-found of Gun chamber, table, 2I pedestal and Y-chamber (Sep 23, 2020)
    958 bytes (135 words) - 15:01, 6 April 2021
  • ===Depo chamber : Replace schneedle, fix pucks, opportunistic jobs=== * Vent Depo Chamber
    4 KB (647 words) - 19:30, 25 May 2021
  • 1- Bubble Chamber progress at Argonne * Bubble Chamber:
    2 KB (378 words) - 09:37, 13 May 2015
  • ...and his model, but that means the 18" HV chamber is longer than the 14" HV chamber by 0.78". #*[[Media:14" HV chamber CEBAF injector vacuum piping dimensions.pptx]]
    2 KB (312 words) - 08:45, 27 April 2022
  • would be based on a novel bubble-chamber technique, which makes use of the fact that a * <span style="font-size:150%"> '''[[Bubble Chamber Reviews]]''' </span>
    2 KB (286 words) - 10:13, 15 December 2015
  • ...er vacuum chamber, doped R30 insulator and spherical electrode. The vacuum chamber is NEG coated, and the anode is ...h 6 cm anode-cathode gap. The GTS 18" photo-gun does not have a NEG coated chamber, and the anode is larger than the CEBAF type, with holes for laser in/out.
    3 KB (480 words) - 15:15, 1 July 2021
  • 1- Bubble Chamber progress at Argonne * PAC41 selected the Bubble Chamber as a '''''High Impact''''' experiment.
    3 KB (482 words) - 15:34, 1 July 2014
  • ...and his model, but that means the 18" HV chamber is longer than the 14" HV chamber by 0.78". #*[[Media:14" HV chamber CEBAF injector vacuum piping dimensions.pptx]]
    2 KB (381 words) - 13:05, 16 May 2022
  • 2. Update on GTS chamber and beam line
    247 bytes (34 words) - 09:56, 16 June 2014
  • * Bubble Chamber work at ANL: back to using C<sub>2</sub>F<sub>6</sub> * Updated procedure and TOSP for bubble chamber January 2017 C<sub>2</sub>F<sub>6</sub> test run:
    829 bytes (106 words) - 16:53, 3 November 2016
  • -Plan for chopping choppers/chopping chamber
    329 bytes (45 words) - 18:09, 8 January 2020
  • * Excel file that models thermodynamics of C<sub>2</sub>F<sub>6</sub> bubble chamber and estimates nucleation thresholds: [[media:ThresholdsC2F6.xlsx]]
    358 bytes (54 words) - 17:00, 2 June 2016
  • 1- Bubble Chamber progress at Argonne 4- Bubble Chamber cost estimate: procurement and labor
    3 KB (502 words) - 09:55, 7 December 2013
  • * Bubble chamber simulation remaining tasks: * Next Bubble Chamber beam test will measure <sup>19</sup>F(γ,α)<sup>15</sup>N
    2 KB (242 words) - 15:00, 24 January 2016
  • ===Diagnostics Chamber Installation ===
    1 KB (221 words) - 09:01, 31 May 2017
  • ** CEBAF depo chamber pics : https://logbooks.jlab.org/entry/3876517
    338 bytes (45 words) - 12:46, 14 May 2021
  • * Vacuum chamber ** Phil - Anything else to be done to the chamber (fiducial fixtures? support base? etc.)
    3 KB (412 words) - 11:43, 17 March 2022
  • ...cate coils, magnet (1010 steel), nickel (alloy 200) magnet mirror, vacuum chamber
    343 bytes (46 words) - 13:55, 19 August 2015
  • 3. Surveying scattering chamber, prepping for removal * Mott scattering chamber (3 space, 3 angle) tomorrow
    869 bytes (119 words) - 14:48, 1 May 2013

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)