User contributions
Jump to navigation
Jump to search
- 09:11, 20 July 2021 diff hist 0 N File:Xi's list of elements through the water irradiation beamline.xls current
- 09:11, 20 July 2021 diff hist +90 UITF Element Database current
- 11:54, 13 July 2021 diff hist 0 N File:Updated to include water irradiation line and removal of elevated line.xls current
- 11:53, 13 July 2021 diff hist +102 Songsheets
- 09:56, 7 July 2021 diff hist 0 N File:To do list at UITF for water irradiation studies 7 7 21.docx current
- 09:55, 7 July 2021 diff hist +7 To do list in preparation for water irradiation and final booster characterizations studies current
- 09:55, 7 July 2021 diff hist 0 To do list in preparation for water irradiation and final booster characterizations studies
- 09:53, 7 July 2021 diff hist +3,056 N To do list in preparation for water irradiation and final booster characterizations studies Created page with "media:to do list at UITF for water irradiation studies 7_7_21.docx Engineering support jobs keV region: *[DC] Reconnect two steering magnet sets and solenoid on the NEG..."
- 09:51, 7 July 2021 diff hist +98 UITC meeting minutes
- 10:31, 25 June 2021 diff hist 0 Poelker mccaughan UITF plans for rest of 2021 current
- 13:22, 21 June 2021 diff hist +65 Poelker mccaughan UITF plans for rest of 2021
- 13:20, 21 June 2021 diff hist +8 Poelker mccaughan UITF plans for rest of 2021
- 13:20, 21 June 2021 diff hist +2 Poelker mccaughan UITF plans for rest of 2021
- 13:20, 21 June 2021 diff hist +2 Poelker mccaughan UITF plans for rest of 2021
- 13:20, 21 June 2021 diff hist +6 Poelker mccaughan UITF plans for rest of 2021
- 13:19, 21 June 2021 diff hist +360 Poelker mccaughan UITF plans for rest of 2021
- 13:16, 21 June 2021 diff hist +34 Poelker mccaughan UITF plans for rest of 2021
- 13:14, 21 June 2021 diff hist +2,179 N Poelker mccaughan UITF plans for rest of 2021 Created page with "Mike McC. and I have been operating under the assumption that UITF is supposed to provide beam for the water irradiation experiment this calendar year and in parallel, we cont..."
- 13:14, 21 June 2021 diff hist -6 Fall Schedule Discussion
- 13:13, 21 June 2021 diff hist +56 Fall Schedule Discussion
- 12:53, 8 June 2021 diff hist +10 CIS Refereed Publications
- 08:44, 8 June 2021 diff hist 0 N File:UITF status report memo to Lab Leadership June 2021.pdf current
- 08:44, 8 June 2021 diff hist +23 UITC meeting minutes
- 08:43, 8 June 2021 diff hist +45 UITC meeting minutes
- 13:35, 4 June 2021 diff hist +9 Phase2 ME meeting minutes 6 3 2021 current
- 13:34, 4 June 2021 diff hist +2,300 N Phase2 ME meeting minutes 6 3 2021 Created page with "let's replace WP1250s inside the rectangular dif pump can with UHV1400 ZAO modules. Gary will model the dif pump can with these modules. Maybe we can use the existing vacuum..."
- 13:32, 4 June 2021 diff hist +42 AIPINJ - Phase 2 Upgrade Meetings
- 11:16, 3 June 2021 diff hist 0 N File:The "s" positions of HDIce beamline.xls current
- 11:15, 3 June 2021 diff hist +1 Beamline Layout
- 11:15, 3 June 2021 diff hist +62 Beamline Layout
- 10:54, 2 June 2021 diff hist 0 N File:Xi's assessment of viewer alignment at UITF.pdf current
- 10:52, 2 June 2021 diff hist +60 UITC meeting minutes
- 14:46, 29 April 2021 diff hist 0 N File:Sunil Pokharel presentation 200 keV beam into Grigory's quarter CM with Nb3Sn coated cavities.pdf current
- 14:46, 29 April 2021 diff hist +4 UITC meeting minutes
- 14:45, 29 April 2021 diff hist +106 UITC meeting minutes
- 11:54, 29 April 2021 diff hist 0 Phase2 ME meeting minutes 4 29 2021 current
- 11:54, 29 April 2021 diff hist +868 N Phase2 ME meeting minutes 4 29 2021 Created page with "Present" Alicia, Reza and Yan, Marcy and Joe, Gary, Shaun and Danny, and Lakshmi Here are the interesting things discussed today: #) Joe will see how the MFA and MFX magnets..."
- 11:50, 29 April 2021 diff hist +43 AIPINJ - Phase 2 Upgrade Meetings
- 11:44, 29 April 2021 diff hist 0 N File:Parts list old and new phase2 beamline.xls current
- 11:42, 29 April 2021 diff hist +53 Phase 2
- 10:50, 27 April 2021 diff hist 0 N File:Chopper to booster 27April21.pdf current
- 10:48, 27 April 2021 diff hist +61 AIPINJ - Phase 2 Layouts
- 11:30, 22 April 2021 diff hist 0 N File:Phase2 beamline 4 22 21.png current
- 11:30, 22 April 2021 diff hist +57 Phase2 ME meeting minutes 4 22 2021 current
- 11:13, 22 April 2021 diff hist +3 Phase2 ME meeting minutes 4 22 2021
- 11:13, 22 April 2021 diff hist +2,213 N Phase2 ME meeting minutes 4 22 2021 Created page with "phase2 ME design meeting minutes 4_22_2021 SHaun, Gary, Matt and Danny Gary made great progress on the phase2 layout, addressing most of the issues discussed last meeting. S..."
- 10:57, 22 April 2021 diff hist +43 AIPINJ - Phase 2 Upgrade Meetings
- 14:12, 14 April 2021 diff hist 0 N File:ESource KOM presentation ILC inverted gun.pptx current
- 14:11, 14 April 2021 diff hist +145 CIS Presentations →2007
- 14:08, 14 April 2021 diff hist 0 N File:JLab ILC inverted gun status.pptx current