- 13:58, 4 April 2022 diff hist -35 April 6, 2022 - HV chamber ME jobs
- 13:58, 4 April 2022 diff hist +75 April 6, 2022 - HV chamber ME jobs
- 13:51, 4 April 2022 diff hist +527 N April 6, 2022 - HV chamber ME jobs Created page with "==Agenda== # Anode assembly prints update from Shaun # Anode flange discussion # HV chamber feet discussion #* CEBAF HV chamber centerline is 13-3/4" above table #* UITF HV c..."
- 13:46, 4 April 2022 diff hist +62 Update meetings
- 09:14, 1 April 2022 diff hist +95 Gun assemblies, electrostatic models and field maps
- 09:12, 1 April 2022 diff hist -15 Designs
- 09:10, 1 April 2022 diff hist 0 N File:Tee electrode manufacturing drawing two piece body.pdf current
- 09:10, 1 April 2022 diff hist +197 Designs →Gun Designs
- 09:04, 1 April 2022 diff hist 0 N File:HV chamber gun 14" diameter drawing.pdf current
- 09:03, 1 April 2022 diff hist +50 Designs
- 09:40, 31 March 2022 diff hist +486 18" Photogun ala GTS
- 09:38, 31 March 2022 diff hist +192 Presentations current
- 09:38, 31 March 2022 diff hist -195 18" Photogun ala GTS
- 09:38, 31 March 2022 diff hist -903 18" Photogun ala GTS
- 09:38, 31 March 2022 diff hist +94 Presentations
- 09:37, 31 March 2022 diff hist +903 N Presentations Created page with "* 03/30/2021 Simulation of the anode tube for 6 and 12-slots Media: R30-3_SLOTS.pptx * 03/02/2021 Simulation of the anode hinge. Shaun's latest model, FINER MESH Media:..."
- 09:36, 31 March 2022 diff hist +50 18" Photogun ala GTS
- 11:16, 28 March 2022 diff hist +146 Mar 29, 2022 - Update Meeting current
- 11:05, 28 March 2022 diff hist -6 Mar 29, 2022 - Update Meeting
- 11:04, 28 March 2022 diff hist +449 N Mar 29, 2022 - Update Meeting Created page with "==Agenda== 1. Target timeframe to have the gun installed in UITF is early June 2. Update from Shaun on anode assembly prints. 3. Priorities for ME 3.1 NEG screens: what is n..."
- 10:59, 28 March 2022 diff hist +52 Update meetings
- 08:33, 22 March 2022 diff hist +98 Mar 23, 2022 - Update Meeting current
- 08:31, 22 March 2022 diff hist +235 N Mar 23, 2022 - Update Meeting Created page with "==Agenda== * NEG screens * HV chamber * Layouts for installing HV chamber in UITF and in CEBAF * [https://jlab-org.zoomgov.com/j/1617282949?pwd=ZDBoQXc0UWw3S01WQzZOYXFRb29Bdz0..."
- 08:28, 22 March 2022 diff hist +52 Update meetings
- 13:14, 21 March 2022 diff hist +159 Gun assemblies, electrostatic models and field maps
- 11:43, 17 March 2022 diff hist +34 Mar 17, 2022 - Update Meeting current
- 11:43, 17 March 2022 diff hist +45 Mar 17, 2022 - Update Meeting
- 11:39, 17 March 2022 diff hist +146 Mar 17, 2022 - Update Meeting
- 11:36, 17 March 2022 diff hist +247 Mar 17, 2022 - Update Meeting
- 09:11, 17 March 2022 diff hist +500 Mar 17, 2022 - Update Meeting
- 08:52, 17 March 2022 diff hist 0 N File:Electrode ball after 950 C for 6 hours vacuum degassing.jpg current
- 08:51, 17 March 2022 diff hist 0 N File:Electrodes in containers after 950 C vacuum degassing.jpg current
- 08:51, 17 March 2022 diff hist +345 Mar 17, 2022 - Update Meeting
- 08:08, 17 March 2022 diff hist 0 N File:InjElectDeg950 6hrs 031522 1040 data plot.jpg current
- 08:08, 17 March 2022 diff hist +173 Mar 17, 2022 - Update Meeting
- 10:17, 16 March 2022 diff hist 0 N File:Tilted anode and tube with 12 and with 6 slots.png current
- 10:17, 16 March 2022 diff hist +2 Mar 17, 2022 - Update Meeting
- 10:16, 16 March 2022 diff hist +189 Mar 17, 2022 - Update Meeting
- 10:12, 16 March 2022 diff hist +110 Mar 17, 2022 - Update Meeting
- 10:11, 16 March 2022 diff hist +84 Mar 17, 2022 - Update Meeting
- 10:09, 16 March 2022 diff hist +153 Mar 17, 2022 - Update Meeting
- 10:08, 16 March 2022 diff hist +548 N Mar 17, 2022 - Update Meeting Created page with "==Agenda== * NEG screens - Marcy * Gun table layouts (UITF, CEBAF) - Shaun * Anode tube versions ** Shaun sent Gabriel models for the 12 narrow and for the 6 wide slot tubes *..."
- 10:02, 16 March 2022 diff hist +52 Update meetings
- 15:04, 10 March 2022 diff hist -76 Update meetings
- 14:04, 10 March 2022 diff hist 0 N File:High current polarized gun schedule + labor estimates Rev01.xlsx current
- 14:03, 10 March 2022 diff hist +77 Update meetings
- 09:06, 10 March 2022 diff hist +94 March 10 2022: Disscussion with SRF production team to install electrode in clnrm current
- 09:04, 10 March 2022 diff hist 0 N File:Current gun aassembly and proposed final step in SRF clnrm.pptx current
- 09:04, 10 March 2022 diff hist +576 N March 10 2022: Disscussion with SRF production team to install electrode in clnrm Created page with "* We are considering lowering the electrode-insulator assembly into the gun HV chamber as the last step, but in the SRF production clean room, instead of in the tunnel or in t..."
- 08:58, 10 March 2022 diff hist +125 Update meetings