GTS meeting 2 28 17
Jump to navigation
Jump to search
Remaining Tasks
- Put voltage on gun with dummy puck, make sure FE is still small at 300 kV, bakeout didn't awake field emitters
- Remove dummy puck, insert activated puck, QE scan (top priority)
- EES: viewers and slits and SCAM and current meters at anode and cup
- DC power: steerer magnets installed and cabled
- Shukui: get green laser into gun, power meter working, attenuator working. Laser boxes and tubes. QE scanner in place and working again.
- Software Control: magnets, viewers, QE scanner, current meters, Verdi laser?, SCAM, attenuator, ND filter, power meter, how are we getting VL beam?
- Turn ON gun, make VL beam to cup, insert slits, check functionality, try a little CW, look at ion pumps
- Repeat with magnet! grab viewer image!