May 11, 2018 - SAD Toolbox Meeting

From Ciswikidb
Revision as of 05:11, 11 May 2018 by Grames (talk | contribs)
Jump to navigation Jump to search

This Last Week-ish

Bubble Run
Added new harp w/ temporary controls
Added ceramic break to radiator (shield aimed downstream), in series w/ FCUP
Added Gumby (10 sec) laser shutter, tested w/ beam and remote enable/disable
Added x-ray card to locate beam position
Upgrade Preparations
Tested HVPS to 300kV in SF6 tank at 15psi, and greater
Suitcase added to Tee, bake ~48 hours up to 165C, Tee vacuum good <100's nA
DecaRad installation below outrigger laser table started, heads/cables ready to dress

Today, Next Week and Beyond

Bubble will continue to run until next Friday @ 8am
S&A begin 200kV electrode measurements 5/11 (per last week's plan)
Met w/ Jerry to review PSS integration plans media:SAD18_PSS_180511.xlsx
PSS dipole measurements vs. expected gun voltage
Upgrade Week 1 media:SAD_180510.docx