November 14, 2018 - Group Meeting

From Ciswikidb
Revision as of 10:23, 9 November 2018 by Grames (talk | contribs)
Jump to navigation Jump to search

Fall 2018 Run, January 2019 SAD and Beyond...

2018 CEBAF Run

Gun2 lifetime and recent QE scan
Hall B Moller and Beam Energy
Mott measurements
SF6 relief valve leak
Hall A Laser restoring
Vertical Wien PS instability addressed

2018 LERF Status

LERF Driver Laser Enclosure Certified
LERF PSS Certification - Support for Gun and Laser enable

January 2019 CEBAF SAD

Heat/Activate Gun2 Photocathode SLSP
John ordered small tank to top off SF6
Install RTP Pockels cell
Implement 1kV anode safe floating bias supply inline with anode-picoammeter
Fiducialize IHA2D00 for Bubble
Accelerator electricians to install two new racks + cable tray in ISB for 200KV Wien HVPS and address iocin6 load

Beyond