February 21, 2019 - Weekly ME Meeting

From Ciswikidb
Revision as of 10:38, 20 February 2019 by Grames (talk | contribs)
Jump to navigation Jump to search
ME Components
Jay's solenoid media:190220_COIL.pdf
Small-shed Gun2 assembly drawing
ME Layouts
Danny Gun region media:190123_gun_to_chopper.pdf
Danny Booster region media:LAYOUT14FEB19.pdf
Danny updated Reza layout dimensions media:Injector upgrade Choppers to Booster v01DM.pptx
Joe Gun + Booster notes media:190123_INJ.pptx
UITF Updates
Booster status
Running beam from no-shed electrode
Status of small-shed electrode
Modeling Updates
Gabriel and Josh need to learn how to run existing CEBAF GPT deck from Gun to Chopper (130 kV, cathode no-shed?, anode grounded, solenoids, Jay Wiens?)
Gabriel's 200kV upgrade modeling jobs
  • Develop CEBAF model that includes small shed, w/ simulations comparing 130kV vs. 200kV (e.g. to predict and compare w/ measurement when goes to CEBAF...Fall?)
  • Turn a Wien filter ON in GPT, gain experience with effect on the beam (start w/ 130kV, you can compare w/ measurement at CEBAF)
  • Optimize/iterate Jay's original 200KV Wien design to one that will provide needed E/B fields
  • Work w/ Alicia to incorporate into the upgrade model of injector, evaluate/optimize optics
Josh's Ion-bombardment modeling jobs