February 21, 2019 - Weekly ME Meeting
Jump to navigation
Jump to search
- ME Components
- Jay's solenoid media:190220_COIL.pdf
- Small-shed Gun2 assembly drawing
- ME Layouts
- Danny Gun region media:190123_gun_to_chopper.pdf
- Danny Booster region media:LAYOUT14FEB19.pdf
- Danny updated Reza layout dimensions media:Injector upgrade Choppers to Booster v01DM.pptx
- Joe Gun + Booster notes media:190123_INJ.pptx
- UITF Updates
- Booster status
- Running beam from no-shed electrode
- Status of small-shed electrode
- Modeling Updates
- Gabriel and Josh need to learn how to run existing CEBAF GPT deck from Gun to Chopper (130 kV, cathode no-shed?, anode grounded, solenoids, Jay Wiens?)
- Gabriel's 200kV upgrade modeling jobs
- Develop CEBAF model that includes small shed, w/ simulations comparing 130kV vs. 200kV (e.g. to predict and compare w/ measurement when goes to CEBAF...Fall?)
- Turn a Wien filter ON in GPT, gain experience with effect on the beam (start w/ 130kV, you can compare w/ measurement at CEBAF)
- Optimize/iterate Jay's original 200KV Wien design to one that will provide needed E/B fields
- Work w/ Alicia to incorporate into the upgrade model of injector, evaluate/optimize optics
- Josh's Ion-bombardment modeling jobs