February 21, 2019 - Weekly ME Meeting

From Ciswikidb
Revision as of 10:46, 20 February 2019 by Grames (talk | contribs)
Jump to navigation Jump to search
ME Components
Jay's solenoid media:190220_COIL.pdf
Small-shed Gun2 assembly drawing
ME Layouts
Danny Gun region media:190123_gun_to_chopper.pdf
Danny Booster region media:LAYOUT14FEB19.pdf
Danny updated Reza layout dimensions media:Injector upgrade Choppers to Booster v01DM.pptx
Joe Gun + Booster notes media:190123_INJ.pptx
UITF Updates
Booster status
Running beam from no-shed electrode
Status of small-shed electrode
Modeling Updates
Gabriel and Josh need to learn how to run existing CEBAF GPT deck from Gun to Chopper (130 kV, cathode no-shed?, anode grounded, solenoids, Jay Wiens?)
Gabriel's 200kV upgrade modeling jobs
Incorporate small-shed to CEBAF model, use GPT to compare 130kV vs. 200kV (to compare at CEBAF when installed?)
Optimize HV design for Jay's original 200KV Wien, work w/ Jay to build E/B model and evaluate in GPT, consider optical/operation improvements
Work w/ Alicia to incorporate 200KV Wien models into the CEBAF upgrade deck, for testing layout we want to build
Josh's Ion-bombardment modeling jobs