Phase 1
Phase 1 Installation
- * Design & ME Planning AIPINJ - Upgrade Meetings
- * Dictionary of Phase 1 Components Phase 1 Beamline Components
- * Installation ATLIS Phase 1 ATLIS
- * All Injector SAD Tasks Phase 1 & SAD ATLIS Tasks
- * Daily Toolbox Meeting Space CIS Phase 1 work plans
- * Phase 1 System Readiness Phase 1 System Readiness
- * 5/4 retired Phase 1 - HCO & Commissioning
Phase 1 Beam Commissioning
Beam Commissioning
- Shift Quick References
- Tracking / Catch-All Phase I Beam Commissioning ATLis: 22060
- Injector Procedures Workspace
- 8AM Meeting: https://bluejeans.com/569476853
- 830 Injector Morning Toolbox Meeting: https://bluejeans.com/171126028
- 1530 Injector Afternoon Toolbox Meeting: https://bluejeans.com/171126028
- On-Call Support: http://opsweb.acc.jlab.org/CSUEApps/weboncall/WebOnCallMain.html
- Day shift, full on-call support
- Swing shift, show-stopper on-call support, with maintenance punchlist (please log!) for items that can wait until next day
- SAD Calendar: https://accweb.acc.jlab.org/calendar/
- CEBAF Restart gaant chart: https://www.jlab.org/accel/ops/ganttproject/2021/2021_Recovery_MA_20210414-chart.html
- Injector Quick reference, Rev17beta, Draft 5 media:12GeV_injector_quick_reference_rev17_DRAFT-5.pdf
- AIPINJ Wiki: CEBAF Injector Upgrade
- Other Docs/Links
- 1/25/21 Beam Drivers Preliminary Meeting
- (5/4/21) Phase 1 Settings for 130kV media:UIPhase1Settings130kV_2021.pdf
- 3/16/21 Beam Drivers Meeting Slides media:BeamDrivers_Pt2_3.16.21.pdf
- Injector Group Beam Commissioning Slides File:BeamINJphase1v5.pptx
- Commissioning Checklist (Grames) File:210401 Phase1 Commissioning.docx
- Typical Commissioning Day
For weekdays up to PSS Certification beginning M 5/24:
Lock-up each morning after maintenance punchlist from previous day addressed.
4p: Shift turnover from days -> swings.
Each night, 12p, Injector -> Restricted Access.
- Beam Parameter Scaling (130kV -> 200kV)
Table goes here. Forthcoming.
- Important Dates
updated 5/4/21
- Finalize commissioning plan: April 5th
- Injector HCO/SR Complete: 5/10 at the earliest
- Injector Beam Commissioning Begins: 5/10 at the earliest
- NL/Inj -> Stable 2K: 5/21
- Full CEBAF PSS Certification: 5/24 - 6/11
- End of SAD: 7/2
- Resumption of Physics: Mid-August
ATLis Testplans
updated 4/26/21
General / Catch-All Test Plans
- 22060 Beam Commissioning AIPINJ Phase I (general ATLis)
- 21170 Injector Upgrade - Phase 1 Installation (Gun to Chopper)
With-Beam Hardware Commissioning Test Plans
- 22061 PSS Kicker Tests @ 130keV & 200keV
- 22080 AIPINJ: 130/200 keV HVPS vs. PCUP current monitor calibration
- 22082 AIPINJ: 130/200 keV lifetime measurements
- 22313 Compare Beam Transmission for Gun Biased at 130 and 200kV
Beam Commissioning
- 22180 Gun to Chopper Commissioning _130keV / 200keV beam to PCup
- 22181 Early Injector Orbit Data Collection Rev. April/May 2021
- 22182 Set up beam from PCup to FC1 at 130keV
- 22183 Beam steer from FC1 to FC2
- 22184 Efficacy of Knobs chosen for spot move correction
Optics/RF Test Plans
- 21923 Perform 130keV emittance measurements and matching as part of Injector Upgrade commissioning
- 22072 Perform 200keV emittance measurements and matching as part of Injector Upgrade commissioning
- 19784 Test multiwire emittance measurement with beam
- 22160 Measure optics at various coil fixture rotation angles for MDR1I02
- 22190 RF Elements Setup (Injector Upgrade Phase 1), Lasers phases, Prebuncher, and Choppers
- 22250 0I02 Viewer vs Harp Emittance Measurement
Spin/Wien Test Plans
- 22090 Mott Hot Checkout
- 22091 Spin Dance to Calibrate Upgraded CEBAF Injector 3D Spin Rotator
- 22092 Set 3D Spin Rotator: Flip-Right, Flip-Left, and Vertical Polarizarion
- 22083 AIPINJ: Test new hysteresis function for spin solenoids (MFG1I04A/B)
- 22084 AIPINJ: 130/200 keV E/B calibrations for V-Wien and H-Wien
- 22330 Measuring time of flight to chopper master slit versus Wien spin angle
Parity Quality Beam Test Plans
- 22040 cathode 45deg rotation and spot moves
- 22050 130keV sensitivity test
- 22051 200keV sensitivity test
- 22052 Transmission test gun 200keV
- 22053 RTP pos diff feedback convergence FC2 test
- 22120 Chopper scan 130keV
- 22121 Chopper scan 200keV
- ATLiss Arranged in Table
Beam Commissioning Schedule
updated 5/4
Beam Commissioning Week #1? -- Earliest possible start date for beam commissioning is 5/10. Actual date may slide.
DAY Shift | Monday 5/10 |
Tuesday 5/11 |
Wednesday 5/12 |
Thursday 5/13 |
Friday 5/14 |
Sat 5/15 |
Sun 5/16 |
Notes/Goals |
---|---|---|---|---|---|---|---|---|
Beam Commissioning Plan (ATLis) |
pre-beam checks Gun->Chopper Commissioning @ 130keV, TM (22180) |
Gun->Chopper Commissioning @ 130keV, TM (22180) | PSS Kicker Cert (22061) PCup -> FC1 @130keV, TM (22182) |
PCup -> FC1 @130keV, TM (22182) | PCup -> FC1 @130keV, CW (22182) /or\ Spot Move Knobs (22184) |
Beam Off | Beam Off | With-beam HCO of all hardware up to 1D; TM setup to FC1/1D, including element centering, correcting for gun kick; Early Injector Orbit Data Collection; Spot move knobs; CW Setup to FC1? |
Shift Leader | Grames | Grames | Beam Off | Beam Off | ||||
Scientist #2 | Bruker | Bruker | Bruker | Hernandez-Garcia | Hernandez-Garcia | Beam Off | Beam Off | |
Ops Inj Support | Forman | Moser | Forman | Forman | Forman | Beam Off | Beam Off | |
SSO / AM Sweeper | Carlino / Jones | Carlino / Jones | Carlino / Jones | Carlino / Jones | Carlino / Jones | Beam Off | Beam Off | |
Other MCC Work, Group, +Persons in MCC | NL PSS Commissioning, SSG, +2 | NL PSS Commissioning, SSG, +2 | NL PSS Commissioning, SSG, +2 | NL PSS Commissioning, SSG, +2 | NL PSS Commissioning, SSG, +2 | |||
SWING Shift | 5/10 | 5/11 | 5/12 | 5/13 | 5/14 | 5/15 | 5/16 | |
Beam Commissioning Plan / ATLis | Gun->Chopper Commissioning @ 130keV, TM (22180) | Gun->Chopper Commissioning @ 130keV, TM (22180) | PCup -> FC1 @130keV, TM (22182) | PCup -> FC1 @130keV, TM (22182) Early Injector Orbit Data (22181) |
PCup -> FC1 @130keV, CW (22182) /or\,Spot Move Knobs (22184) |
Beam Off | Beam Off | |
Shift Leader | Beam Off | Beam Off | ||||||
Scientist #2 | Beam Off | Beam Off | ||||||
Ops Inj Support | Law | Law | Law | Law | Law | Beam Off | Beam Off | |
SSO | Deir | Deir | Deir | Deir | Deir | Beam Off | Beam Off | |
Other MCC Work, Group, +Persons in MCC | ||||||||
CCOC / PD | Aiken (both) | Aiken | Merz / Aiken | Merz / Aiken | Merz / Aiken | Merz / Aiken | Merz / Aiken |
Beam Commissioning Week #2, if no sliding
DAY Shift | Monday 5/17 |
Tuesday 5/18 |
Wednesday 5/19 |
Thursday 5/20 |
Friday 5/21 |
Sat 5/22 |
Sun 5/23 |
Notes/Goals |
---|---|---|---|---|---|---|---|---|
Beam Commissioning Plan (ATLis) |
PCup -> FC1 @130keV, CW (22182) /or\ Spot Move Knobs (22184) |
PCup -> FC1 @130keV, CW (22182) PCup vs Gun HVPS Current Cal (22080) |
Warm RF Setup @130keV (22190) | MDR1I02 Optics vs Rotation (22160) | 0I02-YAG Emittance Measurement (22250) | Beam Off | Beam Off | CW Setup to FC1/1D; Warm RF CW Setup; 1I-0I-region Optics measurements; Lifetime measurement? |
Shift Leader | Grames | Grames | Beam Off | Beam Off | ||||
Scientist #2 | Bruker | Bruker | Bruker | Hernandez-Garcia | Hernandez-Garcia | Beam Off | Beam Off | |
Ops Inj Support | Forman | Forman | Forman | Forman | Forman | Beam Off | Beam Off | |
SSO / AM Sweeper | Gauthier / Moser | Gauthier / Moser | Gauthier / Moser | Gauthier / Moser | Gauthier / Moser | Beam Off | Beam Off | |
Other MCC Work, Group, +Persons in MCC | NL PSS Commissioning, SSG, +2 | NL PSS Commissioning, SSG, +2 | NL PSS Commissioning, SSG, +2 | NL PSS Commissioning, SSG, +2 | NL PSS Commissioning, SSG, +2 | |||
SWING Shift | 5/17 | 5/18 | 5/19 | 5/20 | 5/21 | 5/22 | 5/23 | |
Beam Commissioning Plan / ATLis | PCup -> FC1 @130keV, CW (22182) 1I-0I-region qsUtility @130keV (21923)? |
Warm RF Setup @130keV (22190) | Warm RF Setup @130keV (22190) MDR1I02 Optics vs Rotation (22160)? |
1I-0I-region qsUtility @130keV (21923) | 1I-0I-region qsUtility @130keV (21923) Lifetime Measurement @ 130keV (22082) |
Beam Off | Beam Off | |
Shift Leader | Turner | Turner | Beam Off | Beam Off | ||||
Scientist #2 | Turner | Beam Off | Beam Off | |||||
Ops Inj Support | Law | Law | Law | Law | Law | Beam Off | Beam Off | |
SSO | Anthony | Anthony | Anthony | Anthony | Anthony | Beam Off | Beam Off | |
Other MCC Work, Group, +Persons in MCC | NL Lock-Up/Commissioning, SSG, +2 | NL Lock-Up/Commissioning, SSG, +2 | NL Lock-Up/Commissioning, SSG, +2 | NL Lock-Up/Commissioning, SSG, +2 | NL Lock-Up/Commissioning, SSG, +2 | Beam Off | Beam Off | |
CCOC / PD | Merz / Aiken | Merz / Aiken | Merz / Frierson | Merz / Frierson | Merz / Frierson | Merz / Frierson | Merz / Frierson |
CEBAF PSS Certifications Week 1/3
Beam Commissioning Week #3, if no sliding
DAY Shift |
Monday 5/24 |
Tuesday 5/25 |
Wednesday 5/26 |
Thursday 5/27 |
Friday 5/28 |
Sat 5/29 |
Sun 5/30 |
Notes/Goals |
---|---|---|---|---|---|---|---|---|
Beam Commissioning Plans (ATLis) |
TBD | TBD | TBD | TBD | TBD | Beam Off? / TBD | Beam Off? / TBD | Beam Commissioning on Day Shift ONLY during the week. Weekend? |
Shift Leader | Beam Off? / TBD | Beam Off? / TBD | ||||||
Scientist #2 | Beam Off? / TBD | Beam Off? / TBD | ||||||
Ops Inj Support | TBD: {Law, Moser} | TBD: {Forman, Law, Moser} | TBD: {Forman, Law, Moser} | TBD: {Forman, Law, Moser} | TBD: {Forman, Law, Moser} | Beam Off? / TBD | Beam Off? / TBD | |
SSO / AM Sweeper | Garcia / Moser | Garcia / Moser | Garcia / Moser | Garcia / Moser | Garcia / Moser | Beam Off? / TBD | Beam Off? / TBD | |
Other MCC Work, Group, +Persons in MCC | Beam Off? / TBD | Beam Off? / TBD | ||||||
SWING Shift | 5/24 | 5/25 | 5/26 | 5/27 | 5/28 | Beam Off? / TBD | Beam Off? / TBD | |
PSS CERTIFICATION | PSS Certification | PSS Certification | PSS Certification | PSS Certification | PSS Certification | Beam Off? / TBD | Beam Off? / TBD | |
PSS Test Director | Aiken | Aiken | Aiken | Aiken | Aiken | Beam Off? / TBD | Beam Off? / TBD | |
CCOC / PD | Merz / Frierson | Merz / Frierson | Carlino / Frierson | Carlino / Frierson | Carlino / Frierson | Carlino / Frierson | Carlino / Frierson |
CEBAF PSS Certifications Week 2/3
Beam Commissioning Week #4, if no sliding
DAY Shift |
Monday 5/31 Memorial Day 🇺🇸 |
Tuesday 6/1 |
Wednesday 6/2 |
Thursday 6/3 |
Friday 6/4 |
Sat 6/5 |
Sun 6/6 |
Notes/Goals |
---|---|---|---|---|---|---|---|---|
Beam Commissioning Plans (ATLis) |
No Beam | TBD | TBD | TBD | TBD | Beam Off? / TBD | Beam Off? / TBD | Beam Commissioning on Day Shift ONLY during the week. Weekend? |
Shift Leader | No Beam | Beam Off? / TBD | Beam Off? / TBD | |||||
Scientist #2 | No beam | Beam Off? / TBD | Beam Off? / TBD | |||||
Ops Inj Support | No Beam | TBD: {Forman, Law, Moser} | TBD: {Forman, Law, Moser} | TBD: {Forman, Law, Moser} | TBD: {Forman, Law, Moser} | Beam Off? / TBD | Beam Off? / TBD | |
SSO / AM Sweeper | No Beam | Gauthier / Moser | Gauthier / Moser | Gauthier / Moser | Gauthier / Moser | Beam Off? / TBD | Beam Off? / TBD | |
Other MCC Work, Group, +Persons in MCC | Beam Off? / TBD | Beam Off? / TBD | ||||||
SWING Shift | 5/31 🇺🇸 | 6/1 | 6/2 | 6/3 | 6/4 | Beam Off? / TBD | Beam Off? / TBD | |
PSS CERTIFICATION | PSS Certification | PSS Certification | PSS Certification | PSS Certification | PSS Certification | Beam Off? / TBD | Beam Off? / TBD | |
PSS Test Director | Aiken | Aiken | Aiken | Aiken | Aiken | Beam Off? / TBD | Beam Off? / TBD | |
CCOC / PD | Carlino / Frierson | Carlino / Frierson | Carlino / Merz | Carlino / Merz | Carlino / Merz | Carlino / Merz | Carlino / Merz |
CEBAF PSS Certifications Week 3/3
Beam Commissioning Week #5, if no sliding
DAY Shift |
Monday 6/7 |
Tuesday 6/8 |
Wednesday 6/9 |
Thursday 6/10 |
Friday 6/11 |
Sat 6/12 |
Sun 6/13 |
Notes/Goals |
---|---|---|---|---|---|---|---|---|
Beam Commissioning Plans (ATLis) |
TBD | TBD | TBD | TBD | TBD | Beam Off? / TBD | Beam Off? / TBD | Beam Commissioning on Day Shift ONLY during the week. Weekend? After PSS Certs Beam->FC2 possible |
Shift Leader | Beam Off? / TBD | Beam Off? / TBD | ||||||
Scientist #2 | Beam Off? / TBD | Beam Off? / TBD | ||||||
Ops Inj Support | TBD: {Forman, Law, Moser} | TBD: {Forman, Law, Moser} | TBD: {Forman, Law, Moser} | TBD: {Forman, Law, Moser} | TBD: {Forman, Law, Moser} | Beam Off? / TBD | Beam Off? / TBD | |
SSO / AM Sweeper | Garcia / Moser | Garcia / Moser | Garcia / Moser | Garcia / Moser | Garcia / Moser | Beam Off? / TBD | Beam Off? / TBD | |
Other MCC Work, Group, +Persons in MCC | Beam Off? / TBD | Beam Off? / TBD | ||||||
SWING Shift | 6/7 | 6/8 | 6/9 | 6/10 | 6/11 | Beam Off? / TBD | Beam Off? / TBD | |
PSS CERTIFICATION | PSS Certification | PSS Certification | PSS Certification | PSS Certification | PSS Certification | Beam Off? / TBD | Beam Off? / TBD | |
PSS Test Director | Aiken | Aiken | Aiken | Aiken | Aiken | Beam Off? / TBD | Beam Off? / TBD | |
CCOC / PD | Carlino / Frierson | Carlino / Frierson | Moser / Merz | Moser / Merz | Moser / Merz | Moser / Merz | Moser / Merz |
Beam Commissioning Week #6, if no sliding. FC#2 Running Possible. 24/7 Possible.
DAY Shift | Monday 6/14 |
Tuesday 6/15 |
Wednesday 6/16 |
Thursday 6/17 |
Friday 6/18 |
Sat 6/19 |
Sun 6/20 |
Notes/Goals |
---|---|---|---|---|---|---|---|---|
Beam Commissioning Plan (ATLis) |
TBD | TBD | TBD | TBD | TBD | TBD | TBD | TBD |
Shift Leader | ||||||||
Scientist #2 | ||||||||
Ops Inj Support | TBD: {Forman, Law} | TBD: {Forman, Law} | TBD: {Forman, Law} | TBD: {Forman, Law} | TBD: {Forman, Law} | |||
SSO / AM Sweeper | TBD | TBD | TBD | TBD | TBD | |||
Other MCC Work, Group, +Persons in MCC | ||||||||
SWING Shift | 6/14 | 6/15 | 6/16 | 6/17 | 6/18 | 6/19 | 6/20 | |
Beam Commissioning Plan / ATLis | TBD | TBD | TBD | TBD | TBD | TBD | TBD | |
Shift Leader | ||||||||
Scientist #2 | ||||||||
Ops Inj Support | TBD: {Forman, Law} | TBD: {Forman, Law} | TBD: {Forman, Law} | TBD: {Moser, Forman, Law} | TBD: {Moser, Forman, Law} | |||
SSO | TBD | TBD | TBD | TBD | TBD | |||
Other MCC Work, Group, +Persons in MCC | ||||||||
CCOC / PD | Moser / Merz | Moser / Merz | Moser / Carlino | Moser / Carlino | Moser / Carlino | Moser / Carlino | Moser / Carlino |
Beam Commissioning Week #7, if no sliding. FC#2 Running Possible. 24/7 Running Possible.
DAY Shift | Monday 6/21 |
Tuesday 6/22 |
Wednesday 6/23 |
Thursday 6/24 |
Friday 6/25 |
Sat 6/26 |
Sun 6/27 |
Notes/Goals |
---|---|---|---|---|---|---|---|---|
Beam Commissioning Plan (ATLis) |
TBD | TBD | TBD | TBD | TBD | TBD | TBD | TBD |
Shift Leader | ||||||||
Scientist #2 | ||||||||
Ops Inj Support | TBD: {Forman, Law} | TBD: {Forman, Law} | TBD: {Forman, Law} | TBD: {Moser, Forman, Law} | TBD: {Moser, Forman, Law} | |||
SSO / AM Sweeper | TBD | TBD | TBD | TBD | TBD | |||
Other MCC Work, Group, +Persons in MCC | ||||||||
SWING Shift | 6/21 | 6/22 | 6/23 | 6/24 | 6/25 | 6/26 | 6/27 | |
Beam Commissioning Plan / ATLis | TBD | TBD | TBD | TBD | TBD | TBD | TBD | |
Shift Leader | ||||||||
Scientist #2 | ||||||||
Ops Inj Support | TBD: {Forman, Law} | TBD: {Forman, Law} | TBD: {Forman, Law} | TBD: {Moser, Forman, Law} | TBD: {Moser, Forman, Law} | |||
SSO | TBD | TBD | TBD | TBD | TBD | |||
Other MCC Work, Group, +Persons in MCC | ||||||||
CCOC / PD | Moser / Carlino | Moser / Carlino | TBD / Carlino | TBD / Carlino | TBD / Carlino | TBD / Carlino | TBD / Carlino |
Beam Commissioning Week #8, if no sliding. FC#2 running possible. 24/7 running possible.
DAY Shift | Monday 6/28 |
Tuesday 6/29 |
Wednesday 6/30 |
Thursday 7/1 |
Friday 7/2 |
Sat 7/3 |
Sun 7/4 |
Notes/Goals |
---|---|---|---|---|---|---|---|---|
Beam Commissioning Plan (ATLis) |
TBD | TBD | TBD | TBD | TBD | TBD | TBD | TBD |
Shift Leader | ||||||||
Scientist #2 | ||||||||
Ops Inj Support | TBD: {Moser, Forman, Law} | TBD: {Moser, Forman, Law} | TBD: {Moser, Forman, Law} | TBD: {Moser, Forman, Law} | TBD: {Moser, Forman, Law} | |||
SSO / AM Sweeper | TBD | TBD | TBD | TBD | TBD | |||
Other MCC Work, Group, +Persons in MCC | ||||||||
SWING Shift | 6/28 | 6/29 | 6/30 | 7/1 | 7/2 | 7/3 | 7/4 | |
Beam Commissioning Plan / ATLis | TBD | TBD | TBD | TBD | TBD | TBD | TBD | |
Shift Leader | ||||||||
Scientist #2 | ||||||||
Ops Inj Support | TBD: {Moser, Forman, Law} | TBD: {Moser, Forman, Law} | TBD: {Moser, Forman, Law} | TBD: {Moser, Forman, Law} | TBD: {Moser, Forman, Law} | |||
SSO | TBD | TBD | TBD | TBD | TBD | |||
Other MCC Work, Group, +Persons in MCC | ||||||||
CCOC / PD | TBD / Carlino | TBD / Carlino | TBD / TBD | TBD / TBD | TBD / TBD | TBD / TBD | TBD / TBD |