Dec 9, 2021 - Group meeting

From Ciswikidb
Revision as of 10:34, 9 December 2021 by Grames (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Meeting Coordinates

The ME group will join us for this Wednesday's meeting ... here are the topics we'll discuss

SAD readiness

  • Modify top-hat
  • Install 12 GeV harp
  • Re-install Mott target ladder

200 kV gun jobs

  • insulator/cathode
  • offset biased anode
  • Zao NEGs
  • survey points
  • Layout/table at UITF & CEBAF

UITF Wien (ROBUST)

  • Beam line layout
  • Wien filter assembly
  • Wien quad crosses

UITF Mott (ROBUST)

  • Mott line layout
  • Target ladder + targets
  • Collimators + detectors

5 MeV Mott polarimeter(ARDSRC)

  • as-built drawing package

BNL-JLAB-SRF GUN(COMTRA)

  • Bubble radiator at UITF
  • New short irradiation stand (magnet+detector+shielding)
  • Layout support for integration at BNL

Standing Links