Dec 13, 2022 - CIS Group meeting

From Ciswikidb
Revision as of 21:04, 12 December 2022 by Grames (talk | contribs)
Jump to navigation Jump to search

Agenda

  • Joe announcements
  • Updates
    • 200 kV gun job at UITF (Marcy, Jessica, Phil, Carlos),
    • Plan for CEBAF from now until the SAD begins (Shukui, Steve, Riad),
    • Update on the R&D in GTS (Gabriel) and TL1137 (Mamun, Marcy),
    • JLAB/SLAC/KEK e-/e+ R&D proposal (Andriy, Carlos, Joe, Mamun, Reza, Silviu) media:US-Japan-Topics.pptx
    • Plan to irradiate target foils with e- beam and laser at LERF Lab 6 (Andriy, Shukui, Silviu, Sandesh, Mamun)
  • IPAC'23
    • Update on abstracts submitted to IPAC'23 related to to e-/e+ R&D at LERF
    • M. Rahman et al., "Quantum Efficiency and Lifetime Study for Negative Electron Affinity GaAs Nanopillar Array Photocathode" media:IPAC23 abstract_Aziz.pdf
    • G. Blume et al., "A 5 MeV Compton transmission polarimeter designed for a SRF photogun". media:abstract-1233.pdf
    • J. Grames et al., "Status of Ce+BAF: Polarized Positron Beam Capability at CEBAF 12 GeV" media:abstract-1313.pdf
    • A. Ushakov et al, "Conceptual Design of a High-Power Target for Positron Production at CEBAF" media:abstract-1794.pdf
    • S. Zhang, "What We Learned From Operating Electron Accelerators with Variable bunch Frequencies at JLab" media:IPAC23 abstract_Zhang.pdf