NEG coated 2.5 inch OD BPM's

From Ciswikidb
Revision as of 11:36, 24 August 2023 by Grames (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

200 KV BPM's with NEG coating

ME Design

Assembly Sequence

  1. Receive can/feedthroughs
  2. Clean
  3. Degas
  4. NEG Coat
  5. Check feedthroughs
  6. Assemble feedthroughs
  7. Serialize
  8. Leak check cans
  9. Electrical measurement
  10. Report K's and center

Electrical Measurements (K's, center, and linearity plots)