Development Period - February 9-10
Jump to navigation
Jump to search
Listed in order of suggested priority...
- Re-measure emittance in order to analyze Run 1 conditions (3 hours)
- Test hardware TOF veto at 31MHz and 62MHz (6 hours)
- Test FADC without TDC (2 hours). February 4, 2015: Added two more laser timing signals to FADC. From Disc 708, OUT signal was connected to FADC Ch10 and OUT_bar was connected to Ch12. The original laser timing signal is still connected to Ch9.
- Test background as a function of target ladder position on large target foil (2 hours)
- Test FADC delayed operation (2 hours)