Bubble Chamber Meeting Wednesday July 1, 2015

From Ciswikidb
Revision as of 12:04, 5 July 2015 by Suleiman (talk | contribs)
Jump to navigation Jump to search

We will meet in TL 2221 on Wednesday July 1 at 3:30 pm EST.

For those calling in we'll use the Blue Jeans [1] audio conference system.

Phone number: 1-888-240-2560
Meeting ID: 3528502673#
Meeting URL: http://bluejeans.com/3528502673


Agenda:

1- Bubble Chamber progress at Argonne




Notes from this meeting:


  • Bubble Chamber:
  1. Made the 27" stand for JLab Injector beamline
  2. Ready to start crating, expect to ship by mid-July
  3. Upon arrival at JLab, move to Injector tunnel
  4. Brad will provide description of the shipment and handling instruction
  5. Brad will be at JLab August 3 – 12.


  • Safety Reviews:
  1. Started pressure system approval process
  2. Will need Electrical Review since we have 208 V custom-made electrical distribution box
  3. Need a TOSP with all the operational and safety procedures (fire, power loss, ...)
  4. List of fluids:
    1. Mercury: 150 mL
    2. Superheated Liquid (N2O or C2F6): 40 – 60 mL
    3. Hydraulic Fluid: 5 gal
    4. Silicone Oil for Chiller: 2 L


  • Cancelled shifts of beam scheduled for August except for swing shifts in second week